My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2516 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2516 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 3:28:57 PM
Creation date
5/6/2016 1:41:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2516
Contractor Name
Bow Mar Water and Sanitation District
Contract Type
Loan
County
Arapahoe
Jefferson
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
company, corporation, individual, or firm, other than a bona fide employee, any <br /> fee, commission, percentage, gift, or other consideration contingent upon or <br /> resulting from the award or the making of this CONTRACT. <br /> C. The BORROWER warrants that the NET REVENUE is not encumbered by any other <br /> deeds of trust or liens of any party other than the CWCB or in any other manner, <br /> except for any existing lien(s) identified in Section 5 (Schedule of Existing Debt) of <br /> the PROJECT SUMMARY, which sets forth the position of the lien created by this <br /> CONTRACT in relation to any existing lien(s). <br /> 12. Remedies for Default. Upon default in the payments to be made by the <br /> BORROWER under this CONTRACT, or default in the performance of any covenant or <br /> agreement contained herein, the CWCB, at its option, may: <br /> a. suspend this CONTRACT and withhold further loan disbursements pending <br /> corrective action by the BORROWER, and if the BORROWER does not cure the default <br /> as provided for below, permanently cease loan disbursements and deem the <br /> PROJECT substantially complete; <br /> b. exercise its rights under any appendices to this CONTRACT, including, but not <br /> limited to, the PROMISSORY NOTE and SECURITY AGREEMENT; and/or <br /> c. take any other appropriate action. <br /> The CWCB shall provide written notice to the BORROWER of any such default and <br /> shall give the BORROWER an opportunity to cure within thirty (30) days of receipt of <br /> such notice. All remedies described herein may be simultaneously or selectively and <br /> successively enforced. The CWCB may enforce the provisions of this CONTRACT at <br /> its option without regard to prior waivers of previous defaults by the BORROWER, <br /> through judicial proceedings to require specific performance of this CONTRACT, or by <br /> such other proceedings in law or equity as may be deemed necessary by the CWCB <br /> to ensure compliance with provisions of this CONTRACT and the laws and regulations <br /> under which this CONTRACT is executed. The CWCB's exercise of any or all of the <br /> remedies described herein shall not relieve the BORROWER of any of its duties and <br /> obligations under this CONTRACT. <br /> 13.Operation of Project. The BORROWER shall, without expense or legal liability to <br /> the CWCB, manage, operate and maintain the PROJECT continuously in an efficient <br /> and economical manner. <br /> 14.Borrower's Liability Insurance. <br /> a. Because the BORROWER is a "public entity" within the meaning of the Colorado <br /> Governmental Immunity Act, CRS 24-10-101, et seq., as amended ("Act"), the <br /> BORROWER shall at all times maintain such liability insurance, by commercial policy <br /> or self-insurance as is necessary to meet its liabilities under the Act. <br /> 15.Additional Contract Requirements. Any additional CONTRACT requirements are <br /> set forth in Additional Conditions & Contract Requirements (Section 7) of the <br /> PROJECT SUMMARY. <br /> Page 6 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.