My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-101 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-101 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 8:28:37 AM
Creation date
4/15/2016 8:28:36 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-101
Contractor Name
Upper Platte & Beaver Canal Company
Contract Type
Loan
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DNR COLORADO <br /> Hospital Road Recharge Facility <br /> co If Colorado Water <br /> conservation Board Upper Platte and Beaver Canal Company <br /> Substantially Complete April 1, 2016 <br /> I I- <br /> -_: C:rc •'cskcb Proposed <br /> ,. E: <br /> • 77 <br /> L�4 eRd?cn e'—• <br /> I <br /> _ nn J <br /> Aa ,r{ C,a.,aL/' �ep- Itar. �f <br /> cr r_ Pa bis,_a .1 <br /> :van I_ <br /> r i <br /> Rr - <br /> Project Description <br /> The Upper Platte ft Beaver Canal Company, provides irrigation water to a 9,500-acre service area <br /> composed of irrigated alluvial land situated between the South Platte River and Beaver Creek, <br /> extending from its Platte River diversion headgate just west of the City of Fort Morgan to <br /> approximately 4 miles east of the Town of Brush. <br /> Along with supplying irrigation water to shareholders, the Company operates a recharge plan that <br /> generates recharge credits to replace out-of-priority depletions attributable to well pumping. The <br /> Company has a decreed recharge plan involving recharge ponds, reaches, and augmentation wells. <br /> Currently, the operation of the recharge plan results in restrictions on well pumping due to the lack of <br /> recharge credits and requires the use of augmentation wells. The Company needed an additional <br /> recharge pond and especially needed a pond at a greater distance to the South Platte River. <br /> This project included the construction of an additional recharge pond at a greater distance from the <br /> river to generate recharge credits of sufficient volume and proper timing to allow well pumping to <br /> provide a full water supply. <br /> Note that the original project included the widening of an existing bridge at its main diversion facilities <br /> on the Platte River; this element project was not constructed, as the Company is investigating <br /> additional river diversion projects that will likely include those elements. <br /> PROJECT D A T A <br /> Sponsor: Upper Platte ft Beaver Canal Co. County: Morgan Water Source: South Platte River <br /> Type of Project: Augmentation Board Approval Date: July 2014 <br /> Loan Terms: 1.75%for 10 years (Original) $190,890 (Final) $119,685.76 <br /> Design Engineer: TZA Water Engineers <br /> Contractor: Castle Rock Construction Company <br /> Project Elements: Excavation of an augmentation pond <br /> Water Project Loan Program - Project Summary <br />
The URL can be used to link to this page
Your browser does not support the video tag.