My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-904 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2017-904 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 8:25:16 AM
Creation date
3/24/2016 10:10:52 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-904
Contractor Name
Julesburg Irrigation District
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feb 03 2016 11:13PM HP FaxConcrete 9705219607 page 2 <br /> CONCRETE SPECIALTIES AND Estimate <br /> UTILITIES CONSTRUCTION, INC. <br /> 11820 COUNTY RD 370 Date Estimate# <br /> STERLING,CO 80751 <br /> 2'4/2016 445 <br /> Name/Address <br /> JULESBURG IRRIGATION DISTRICT <br /> 315 CEDAR STREET <br /> JULESBURG,CO 80737 <br /> Project <br /> Description Qty Cost Total <br /> ESTIMATE FOR THE CONSTRUCTION OF A NEW 1 219.810.00 219,810.00 <br /> MEASURING FLUME AT THE HEAD OF THE HARMONY <br /> DITCH#1 NEAR THE SOUTH PLATTE RIVER THIS <br /> ESTIMATE INCLUDES MOBILIZATION,DEWATERING, <br /> EARTH WORK,SHEET PILING AND STRUCTURAL <br /> CONCRETE TO COMPLETE THE PROJECT.THE NEW <br /> FLUME WILL BE CONSTRUCTED UPSTREAM FROM THE <br /> EXISTING FLUME.DEMOLITION OF THE EXISTING FLUME <br /> IS NOT INCLUDED IN THIS BID.IT IS UNDERSTOOD THAT <br /> THE PROJECT WOULD BE CONSTRUCTED IN LATE <br /> SUMMER FOLLOWING IRRIGATION SEASON. <br /> PRICE GOOD FOR 30 DAYS OF ESTIMATE <br /> Total 5219,810.00 <br /> Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.