My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-916 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2017-916 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2016 10:03:35 AM
Creation date
3/21/2016 9:42:09 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-916
Contractor Name
Grand Junction, City of
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DNR COLORADO 1313 Sherman Street John Hickenlooper, Governor <br /> As3Denver, CO 80203 Robert Randall, Interim DNR <br /> CO i Colorado Water Executive Director <br /> Conservation Board P (303)866-3441 <br /> Department of Natural Resources F(303)866-4474 James Eklund, CWCB Director <br /> TO: Colorado Water Conservation Board Members <br /> FROM: Anna Mauss P.E., Project Manager (, 111 <br /> Kirk Russell, P.E., Finance Section Chief /L.,,e,14_ <br /> DATE: March 16-17, 2016 Board Meeting (Updated March 18, 2016) <br /> AGENDA ITEM: 13a. Water Project Loans / WSRA Grants <br /> City of Grand Junction - Hallenbeck Reservoir No. 1 Dam Rehabilitation <br /> Introduction <br /> The City of Grand Junction (City), acting by and through its water activity enterprise, is applying for a <br /> loan and grant for the Hallenbeck Reservoir No. 1 Dam Rehabilitation (Project). In June of 2014, <br /> Hallenbeck Reservoir No. 1 (aka Purdy Mesa) developed an 80-foot crack on the downstream slope of <br /> the dam. The City immediately contacted the Office of the State Engineer (SEO) Dam Safety Branch <br /> and voluntarily drained the reservoir. The purpose of the Project is to repair the dam and restore the <br /> full storage capacity of the reservoir. The total Project cost is estimated to be $1,153,800. The City is <br /> requesting a loan from the CWCB for approximately 87% of the Project cost and WSRA grants for the 9% <br /> of the Project cost. The balance will be funded by cash from the City. See attached Project Data Sheet <br /> for a location map and Project summary. <br /> Staff Recommendation for CWCB Loan (Board approved Staff Recommendation on March 16, 2016) <br /> Staff recommends the Board approve a loan not to exceed $1,010,000 ($1,000,000 for Project costs and <br /> $10,000 for the 1% service fee) to the City of Grand Junction, acting by and through its water activity <br /> enterprise, for costs related to the Hallenbeck Reservoir No. 1 Dam Rehabilitation Project from the <br /> Construction Fund. The loan terms shall be 20 years at the reduced middle-income municipal interest <br /> rate of 2.65% per annum. Security for the loan shall be in compliance with CWCB Financial Policy#5. <br /> Staff Recommendation for WSRA Grant (Board approved Staff Recommendation on March 16, 2016) <br /> Staff recommends approval of up to $75,000 from the Statewide Account and $25,000 from the <br /> Gunnison Basin Account to the City of Grand Junction, acting by and through its water activity <br /> enterprise, for costs related to the Hallenbeck Reservoir No. 1 Dam Rehabilitation Project. <br /> /mow 1 A <br /> Interstate Compact Compliance •Watershed Protection • Flood Planning a Mitigation • Stream a Lake Protection '/ ' =) <br /> Water Project Loans a Grants • Water Modeling • Conservation Et Drought Planning •Water Supply Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.