My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2515 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2515 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 9:18:18 AM
Creation date
3/3/2016 2:49:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2515
Contractor Name
Lookout Mountain Water District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: LOOKOUT MOUNTAIN WATER AGENCY NAME: COLORADO WATER <br /> DISTRICT ACTING BY AND THROUGH ITS CONSERVATION BOARD <br /> WATER ACTIVITY ENTERPRISE CONTRACT TYPE: LOAN/PUBLIC <br /> REQUESTED LOAN AMOUNT: $3,069,000 CWCB CMS:85565/CORE: CT2016-2515 <br /> LOAN ORIGINATION FEE: $30,690 <br /> TOTAL LOAN AMOUNT: $3,099,690 <br /> LOAN CONTRACT <br /> This contract ("CONTRACT" or"LOAN CONTRACT")) is made between the State of Colorado for the <br /> use and benefit of The Department of Natural Resources, Colorado Water Conservation Board <br /> ("CWCB" or "State"), and Lookout Mountain Water District ("BORROWER"), a Colorado Title 32 <br /> Special District, acting by and through its Water Activity Enterprise, ("BORROWER"or"DISTRICT"). <br /> FACTUAL RECITALS <br /> 1. CWCB authority exists in the law, and funds have been budgeted, appropriated and otherwise <br /> made available and a sufficient unencumbered balance thereof remains available for <br /> encumbering and subsequent payment of this CONTRACT;and <br /> 2. Required approval, clearance, and coordination have been accomplished from and with <br /> appropriate agencies; and <br /> 3. On November 18, 2015 CWCB ("Board") approved a loan request from the BORROWER for the <br /> Upper Beaver Brook Dam Spillway ("PROJECT")to increase storage by improving the existing <br /> rock-cut spillway. The total estimated project cost is $3,410,000. The total loan amount of <br /> $3,099,690 which includes a one percent (1%) loan origination fee of $30,690 is payable <br /> over 30 years at an interest rate of 3.25%; and <br /> 4. The PROJECT SUMMARY, attached as APPENDIX 1 and incorporated herein, contains <br /> BORROWER Information (Section 1), the PROJECT Description (Section 2), CWCB's authority <br /> for making this loan (Section 3), and CWCB Approval or Legislative Authorization (Section 4), <br /> identifying the amount of the loan and the terms of repayment. The PROJECT SUMMARY also <br /> contains sections on BORROWER'S debt, collateral, procedures and eligible expenses. <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this PROJECT <br /> upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained herein, the <br /> parties agree as follows: <br /> A. LOAN PROVISIONS <br /> 1. Loan Origination Fee. The amount of the loan (LOAN AMOUNT) shall include (1) the <br /> amount of the funds loaned by the CWCB to the BORROWER for the PROJECT and (2) a <br /> loan origination fee of one percent (1%) of the PROJECT amount. In the event that the <br /> BORROWER does not use the full LOAN AMOUNT authorized, the parties shall amend this <br /> CONTRACT or exercise an OPTION LETTER (as outlined in section A.3b. and attached as <br /> APPENDIX 2) to revise the LOAN AMOUNT including adjustment of the loan origination fee <br /> to reflect 1% of the actual LOAN AMOUNT disbursed to the BORROWER. <br /> Page 1 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.