My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150237 Application
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C150237 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 3:15:17 PM
Creation date
2/16/2016 3:15:16 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-040
C150237
Contractor Name
Penrose Water District
Contract Type
Loan
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br /> 7. Please list the names,addresses and phone numbers of the Applicants'engineer(s)and attorney(s). <br /> NAME ADDRESS and PHONE <br /> Rocco F.Meconi Rocco F.Meconi,P.C. <br /> 718 Main Street,PO Box 1540,Canon City,CO 81215 <br /> Phone: 719-275-7551 <br /> Mary L.Presecan,P.E. Leonard Rice Engineers,Inc. <br /> 2000 Clay Street,Suite 300,Denver,CO 80211-5119 <br /> Phone: 303-455-9589 (Water resource related services) <br /> Edward D.Meyer,P.E. GMS,Inc.,Consulting Engineer <br /> 611 North Weber, Suite 300,Colorado Springs,CO 80903 <br /> Phone: 719-475-2935 (Civil design and general administration <br /> services) <br /> 8. List any feasibility studies or other investigations that have been completed or are now in progress <br /> for the proposed project. Please submit one copy of each completed study with this application. <br /> See attached Loan Feasibility Study for Raw Water Acquisition and Utilization prepared <br /> as an integral part of this application. <br /> 9. Estimated cost of the project.Please include estimated engineering costs,and estimated construction <br /> costs,if known. (See Table 5 in Study for detailed breakdown) <br /> Estimated Engineering Costs:$ 1,616,163 <br /> Estimated Construction Costs: $ 5,419,655 <br /> Estimated Other Costs: $ 2,694,183 (land acquisition,water rights purchase,etc.) <br /> Estimated Total Costs: $ 9,730,000 <br /> 10. Loan amount and terms you are requesting. <br /> Requested Loan Amount: $ 8,757,000 (Usually 75-90%of Est.Total Costs) <br /> Term(length)of loan: 30 years (Usually 10,20,or 30 years) <br /> Interest Rate: 3.25 % (Please call for our current rates) <br /> Part C.—Project Sponsor Financial Information <br /> Because the CWCB Construction Fund is a revolving fund, it is important that the project <br /> sponsor have the financial capacity to repay any loans made by the CWCB. The following <br />
The URL can be used to link to this page
Your browser does not support the video tag.