My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150237 Application
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C150237 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 3:15:17 PM
Creation date
2/16/2016 3:15:16 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-040
C150237
Contractor Name
Penrose Water District
Contract Type
Loan
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br /> Formed under Colorado Revised Statutes. Requested data included as Appendix A in <br /> attached study. <br /> 4. Please provide a brief description of the owner's existing water supply facilities and describe any <br /> existing operational or maintenance problems. Attach separate sheets if needed,and a map of the <br /> service area. <br /> See attached Loan Feasibility Study. The District's water facilities consist of intake facilities <br /> to intercept water from the Beaver Park Water, Inc.'s canal as well as a connection point <br /> from Brush Hollow Reservoir. The water is diverted into the District's water treatment plant <br /> that provides treatment levels in accordance with CDPHE regulations for surface water <br /> sources. The water is conveyed to the District's distribution system and storage facilities. <br /> The District's distribution system provides service to its 1,701 connected users. The <br /> District's water supply is obtained by virtue of a lease with Beaver Park Water,Inc. This <br /> project is geared to enable the District to pay for additional surface water rights on the <br /> Arkansas River and develop those rights by way of a well field and a transmission line to ✓ <br /> convey the consumptive use of the rights to an enlarged Brush Hollow Reservoir. This will <br /> allow the District to diversify its water supply sources and better assure itself of meeting the <br /> District's raw-water needs during drought conditions. <br /> For existing facilities indicate: <br /> Number of shareholders NA or Number of customers served 1,701 taps(1,838 ERUs) <br /> Current Assessment per share$ NA Number of shares NA <br /> Number of acres irrigated NA Water Right: NA CFS. <br /> Average water diverted per year: 489 acre-feet. <br /> Part B.-Description of the Project <br /> 1. Name of the project or facility: Penrose Raw Water Acquisition and Development Project <br /> 2. Purpose of this loan application. Check one. <br /> X New project <br /> Rehabilitation or replacement of existing facility <br /> Enlargement of existing facility <br /> Emergency Repair <br />
The URL can be used to link to this page
Your browser does not support the video tag.