My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150318 Application
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C150318 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 11:13:50 AM
Creation date
2/16/2016 11:13:49 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150318
Contractor Name
Last Chance Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11 1 <br /> CWCB Water Project Loan Application <br /> 6. Will the acquisition of additional water rights be necessary? YES NO X <br /> If YES,please explain. <br /> 7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br /> attorney(s). <br /> NAME ADDRESS and PHONE <br /> Chad Te Velde, P.E., 4350 Highway 66, Longmont, Colorado 970-535-9318 <br /> Scott Hoiwick, Associate, 515 Kimbark Street, Longmont, Colorado 303-776-9900 <br /> 8. List any feasibility studies or other investigations that have been completed or are now in <br /> progress for the proposed project.If so,submit one copy of the study with this application <br /> Attached is a Feasibility Study completed by AGPROfessionals, LLC. <br /> 9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br /> construction costs,if known. <br /> Estimated Engineering Costs: $ 0.00, LCDC already paid engineering costs <br /> Estimated Construction Costs: $ .2 o 0 0 <br /> �yPcj q l-r C <br /> �5 <br /> , <br /> Estimated Other Costs: $0.00 (land,water rights purchase,etc.) <br /> Estimated Total Costs: $ 170,000 -- $190,000 5 C. V <br /> 10. Loan amount and terms you are requesting. 183, c o o -- G✓ <br /> Requested Loan Amount: (Usually 90%of est.Total Costs) <br /> Term(length)of loan: 30 years (Usually 10,20,or 30 years) <br /> Interest Rate: 4.55% (Please call for our current rates) <br /> Part C.-Project Sponsor Financial Information <br /> Because the CWCB's Fund is a revolving fund, it is important that the project sponsor have the <br /> financial capacity to repay any loans made by the CWCB. The following information is needed to <br /> assist the CWCB in a preliminary assessment of the applicant's financial capacity. The project <br /> sponsor will submit the three most recent annual financial statements. <br /> I. List any existing long-term liability (multi-year) or indebtedness that exceeds one thousand <br /> dollars. For example, bank loans, government agency loans,bond issues, accounts payable,etc. <br /> Include names and addresses of lenders, amounts,due dates and maturity dates. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.