My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2004 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2004 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 3:28:57 PM
Creation date
2/9/2016 10:27:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2004
Contractor Name
Parkville Water District
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and filing. <br /> L. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br /> inspection for the CWCB staff. <br /> M. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are <br /> due. <br /> SECTION 9—ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. <br /> C. Preparing environmental assessment or environmental impact statements, and otherwise <br /> complying with the Federal National Environmental Policy Act. <br /> D. Complying with all federal, state, and local regulatory requirements, including the <br /> obtaining of all required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br /> regulations. <br /> F. Actual construction as called for in the design documents and in change orders approved <br /> by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and construction <br /> management for CWCB approved change orders. <br /> H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the CONTRACT. <br /> I. Legal services for reviewing engineering services contracts, reviewing this CONTRACT, <br /> reviewing construction contract documents, and for complying with all federal, state, and <br /> local regulatory requirements. <br /> J. PROJECT-related expenses incurred prior to the Effective Date of this CONTRACT in <br /> accordance with the approval of this loan. <br /> SECTION 10—DISBURSEMENT SCHEDULE <br /> For PROJECT costs: The BORROWER shall prepare a periodic progress report that sets <br /> forth a statement of the PROJECT costs expended for that period and shall forward said <br /> statement to the CWCB. After receipt of the periodic progress report from the BORROWER, <br /> and review and acceptance of the items therein as eligible expenses, as described above, <br /> the CWCB will pay to the BORROWER the amount set forth in the report or such portion as <br /> has been approved by the CWCB. Such payment shall be made within thirty (30) days <br /> from the CWCB's approval of each progress report. <br /> SECTION 11 —TIME FOR PERFORMANCE <br /> PROJECT BEGINS: Upon Effective Date of this CONTRACT (the date this CONTRACT is <br /> signed by the State Controller or his designee). <br /> PROJECT END DATE: Three (3) years from the Effective Date of this CONTRACT. <br /> Appendix 1 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.