My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2004 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2004 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 3:28:57 PM
Creation date
2/9/2016 10:27:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2004
Contractor Name
Parkville Water District
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: PARKVILLE WATER DISTRICT AGENCY NAME: COLORADO WATER <br /> REQUESTED LOAN AMOUNT: $180,000 CONSERVATION BOARD <br /> LOAN ORIGINATION FEE: $1,800 CONTRACT TYPE: LOAN/PUBLIC <br /> TOTAL LOAN AMOUNT: $181,800 CWCB CMS: 83652/CORE: CT2016-2004 <br /> LOAN CONTRACT <br /> This contract ("CONTRACT" or "LOAN CONTRACT")) is made between the State of <br /> Colorado for the use and benefit of The Department of Natural Resources, Colorado <br /> Water Conservation Board ("CWCB" or "State"), and Parkville Water District, 2015 N. <br /> Poplar St., Leadville, Colorado, 80461, a Title 32 Colorado Special District ("BORROWER"). <br /> FACTUAL RECITALS <br /> 1. CWCB authority exists in the law, and funds have been budgeted, appropriated and <br /> otherwise made available and a sufficient unencumbered balance thereof remains <br /> available for encumbering and subsequent payment of this CONTRACT; and <br /> 2. Required approval, clearance, and coordination have been accomplished from and <br /> with appropriate agencies; and <br /> 3. On September 17, 2015, CWCB ("Board") approved a loan request from the <br /> BORROWER for the Evans Reservoir Bypass Flume Replacement ("PROJECT") to <br /> rehabilitate the Evans Reservoir Bypass Flume, which has reached the end of its <br /> useful life. The total estimated project cost is $533,430. The total loan amount of <br /> $181,800 which includes a one percent (1%) loan origination fee of$1,800 is payable <br /> over 10 years at an interest rate of 1.95%; and <br /> 4. The PROJECT SUMMARY, attached as APPENDIX 1 and incorporated herein, contains <br /> BORROWER Information (Section 1), the PROJECT Description (Section 2), CWCB's <br /> authority for making this loan (Section 3), and CWCB Approval or Legislative <br /> Authorization (Section 4), identifying the amount of the loan and the terms of <br /> repayment. The PROJECT SUMMARY also contains sections on BORROWER'S debt, <br /> collateral, procedures and eligible expenses. <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this <br /> PROJECT upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained <br /> herein, the parties agree as follows: <br /> A. LOAN PROVISIONS <br /> 1. Loan Origination Fee. The amount of the loan (LOAN AMOUNT) shall include (1) <br /> the amount of the funds loaned by the CWCB to the BORROWER for the PROJECT <br /> and (2) a loan origination fee of one percent (1%) of the PROJECT amount. In the <br /> event that the BORROWER does not use the full LOAN AMOUNT authorized, the <br /> parties shall amend this CONTRACT or exercise an OPTION LETTER (as outlined in <br /> Page 1 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.