My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150159 Change Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C150159 Change Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2016 9:16:06 AM
Creation date
2/1/2016 4:04:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150159
CT2017-1209
Contractor Name
Orphan Wells of Wiggins
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DNR COLORADO 1313 Sherman Street John Hickenlooper, Governor <br /> Denver, CO 80203 <br /> CO Colorado Water Mike King, DNR Executive Director <br /> Conservation Board P (303) 866-3441 <br /> Department of Natural Resources F(303) 866-4474 James Eklund, CWCB Director <br /> TO: Colorado Water Conservation Board Members <br /> FROM: Kirk Russell, P.E., Finance Section Chief v� <br /> DATE: January 25-26, 2016 Board Meeting (Updated January 27, 2016) <br /> AGENDA ITEM: 19b. Change to Existing Loans <br /> Orphan Wells of Wiggins - Collateral Change <br /> Introduction <br /> Orphan Wells of Wiggins, LLC (Company) was originally approved for a loan in November 2003 (Loan <br /> Contract C150159) to construct a groundwater recharge augmentation system, consisting of one recharge <br /> well, one augmentation well, five miles of pipeline, and various recharge ponds (Project). The Project was <br /> substantially completed on March 1, 2011 and the Company made their first annual payment on March 1, <br /> 2012. <br /> At the July 2011 CWCB Board meeting, the Board approved a reduction in the interest charges incurred by <br /> the Company by $56,872.44. At that time, the Company agreed to use five shares of Riverside Reservoir <br /> stock and one share of Jackson Lake Reservoir Share as collateral. Prior to CWCB amending the loan <br /> contract, the Company sold the remaining shares and is now requesting the Board change its original <br /> collateral requirement and allow the Company to use the cash from the sate to fund water court efforts <br /> and the installation of additional pipe and augmentation ponds. Staff has requested that the Project <br /> components, including approximately five miles of pipe, pumps and wells, as security for the loan. This is <br /> collateral is consistent with most CWCB loans of this type. The Pledge of Assessment Revenues backed by <br /> an assessment covenant will remain in place. <br /> Staff Recommendation (Board approved Staff Recommendation on January 26, 2016) <br /> Staff recommends that the Board approve an amendment to the Orphan Wells of Wiggin's LLC 's Loan <br /> Contract C150159 changing the collateral from five shares of Riverside Reservoir stock and one share of <br /> Jackson Lake Reservoir to the Project components including the pipeline, pumps, and wells constructed <br /> with the CWCB funds. The amended contract amount will be established as the loan balance at the time of <br /> the contract amendment (approximately $615,220.28) and an annual payment of $36,961.30. <br /> -y «o4, <br /> `•<- ..ter.. <br /> Interstate Compact Compliance •Watershed Protection • Flood Planning a Mitigation • Stream a Lake Protection J <br /> Water Project Loans a Grants •Water Modeling • Conservation &Drought Planning •Water Supply Planning <br /> * 1876 <br />
The URL can be used to link to this page
Your browser does not support the video tag.