My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-003 Increase Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
CT2015-003 Increase Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2016 12:54:44 PM
Creation date
2/1/2016 12:54:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-003
C150378
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A DNR COLORADO Reservoir No. 4 Rehabilitation <br /> Co - Colorado Water North PoudreIrrigation Company <br /> Conservation Board P y <br /> January 2016 Board Meeting <br /> (Loan Increase) <br /> LOAN DETAILS <br /> Project Cost: $2,490,000 <br /> CWCB Loan (with Service Fee): $2,263,410 6 t <br /> Loan Term and Interest Rate: 30 Years ® 2.35% 44.-701 <br /> oiiii <br /> Funding Source: Construction Fund I 5 <br /> BORROWER TYPE 44 at 4 i <br /> 111141 irl 11111 <br /> Agriculture Municipal Commercialf � <br /> 37% 1% Low - 57% Mid - 4% High <1% <br /> PROJECT DET AILS 7 <br /> Project Type: Reservoir Rehabilitation 1 ^ 7 <br /> Average Annual Delivery: 44,400 AF 1 _ .� <br /> ,. . <br /> Storage Preserved: 1,781 AF N -�_LOCC A TION <br /> The North Poudre Irrigation Company is a mutual ditch County: Larimer <br /> company established in 1901. The Company's office is Water Source: Cache la Poudre River <br /> located in Wellington with a service area of Drainage Basin: South Platte <br /> approximately 28,000 irrigated acres of farm land. Division: 1 District: 3 <br /> Reservoir No. 4 is an off stream reservoir constructed in <br /> the late 1880s, enlarged in the 1920s, and had the outlet works replaced in the late 1950s. The <br /> Reservoir No. 4 Rehabilitation Project will modify the dam including its slope, outlet works, drains, <br /> spillway, and measurement structure and will also provide a new parking area and floodplain <br /> improvements. The purpose of the project is to lift the State Engineer's storage restriction on the <br /> reservoir and dam and improve the overall reservoir facility. Project costs have increased from the <br /> feasibility cost estimate as a result of design changes and bids received in September 2015. Reservoir <br /> construction begain in November 2015 and is scheduled for completion in May 2016. <br /> Project Site <br /> CFt. Collin <br /> • 1-25 <br /> C Windsor <br /> Reservoir No. 4's <br /> Restricted Dam <br /> Water Project Loan Program - Project Data Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.