My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-1795 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-1795 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2016 2:18:29 PM
Creation date
2/1/2016 10:07:22 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2795
Contractor Name
Orchard Ranch Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
* DNR COLORADO Orchard Ranch Ditch Pipe Project <br /> co , Colorado Water Orchard Ranch Ditch Company <br /> conservation Board P y <br /> ,;apartment of Nat,ral Resources January 2016 Board Meeting <br /> LOAN DETAILS$ <br /> Project Cost: $1,430,720 kr I I I iir7W1 , <br /> CWCB Loan (with Service Fee): $151,500 wiri6ipillopfltrot <br /> Loan Term and Interest Rate: 30-Years ® 1.95%Funding Source: Severance Tax Perpetual Base Fund ,BORROWER TYPE ii <br /> Agriculture Municipal Commercial %Ilk <br /> 86% 14% Low - 0%Mid - 0% High 0% <br /> PROJECT DETAILS 14400W <br /> 3 <br /> Project Type: Ditch Rehabilitation 7 P%We Average Annual Delivery: 2,750 AF <br /> The Company serves approximately 350 irrigated acres in L 0 C A T I 0 N <br /> Delta County, approximately 10 miles north of the town County: Delta <br /> of Delta, diverting all its supplies via a concrete diversion Water Source: Surface Creek <br /> structure on Surface Creek. The Company's ditch was Drainage Basin; Gunnison River <br /> constructed in the late 1800s by a group of early settlers Division: 4 District: 40 <br /> cooperating to get water to their new farms, and has <br /> been in continuous operation since that time. The <br /> proposed project will pipe the 1.6 mile long main earthen canal and portions of 4 laterals. The project <br /> will be done in conjunction with the U.S. Bureau of Reclamation's Colorado River Basin Salinity Control <br /> Program. Approximately 90% of project costs will be provided by a grant from the the U.S. Bureau of <br /> Reclamation. Construction is expected to begin in mid-2016 with completion by mid-2017. <br /> tr"tc- . -8 <br /> Existing ditch 1. • <br /> 0 le <br /> Na, Bertram lateral pipe 4 <br /> 70 1'airsede <br /> CI Clifton a. , . e <br /> Grand l s Stability pipe to Keh-Land y- i Upper piP° <br /> Junction ° r <br /> Grand MesaIV, r, 4 l ,, l t 4e.„ 00 *` x V <br /> ....,r4 Headgate and -,. <br /> °+e, screening structure -., <br /> i N , <br /> Project Site <br /> North Road lateral pipe <br /> ^. (Does not deliver to e; ,,pp" <br /> Cedaredge Keh-Land) SA rAt' ‘4 di: <br /> X <br /> i 1.4.: , sl:t.$,'- <br /> . 5\ <br /> lai) <br /> k. <br /> o nih and ity - r <br /> No <br /> Main pipe , ,tr <br /> Delta _ .,. <br /> Dommguer-t scalante "' mit <br /> National Gun . 7 Pipes To Be Installed: <br /> '4 w <br /> Main l» '' <br /> Upper OM <br /> Stability pipe <br /> Bertram lateral <br /> s "" North Road lateral <br /> McKinney lalerea -�,; <br /> Valentine lateral <br /> Valentine lateral pipe McKinney lateral pipe 14 <br /> Nilleimalito 1 � <br /> 1 t . <br /> ..." "' •• .r"' <br /> Water Project Loan Program - Project Data Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.