My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-1795 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-1795 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2016 2:18:29 PM
Creation date
2/1/2016 10:07:22 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2795
Contractor Name
Orchard Ranch Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DNR COLORADO 1313 Sherman Street John Hickenlooper, Governor <br /> Denver, CO 80203 <br /> CO Colorado Water Mike King, DNR Executive Director <br /> Conservation Board P (303) 866-3441 <br /> Department of Natural Resources F(303)866-4474 James Eklund, CWCB Director <br /> TO: Colorado Water Conservation Board Members <br /> FROM: Derek Johnson, P.E., Project Manager �(2.1 <br /> Kirk Russell, P.E., Finance Section Chief dE �' <br /> DATE: January 25-26, 2016 Board Meeting (Updated January 27, 2016) <br /> AGENDA ITEM: 18a. Water Project Loans <br /> Orchard Ranch Ditch Company - Orchard Ranch Ditch Piping <br /> Introduction <br /> The Orchard Ranch Ditch Company (Company) is applying for a loan for the construction of the Orchard <br /> Ranch Ditch Piping (Project). The purpose of the Project is to reduce the amount of salt load entering <br /> into the Colorado River, which meets the goals of the US Bureau of Reclamation (Bureau) Colorado <br /> River Basin Salinity Control Program. This is to be accomplished by replacing the Company's existing <br /> conveyance system, consisting of an earthen main canal and several connected earthen laterals, with <br /> an in-place piped system. The Project will reduce seepage losses in the ditch, and help the Company <br /> manage its delivery system in proximity to encroaching development. The total Project cost is <br /> estimated to be $1,430,720. The Company is requesting a $150,000 loan from the CWCB to cover <br /> approximately 10% of Project costs, and the remaining costs are to be covered by a Bureau grant of <br /> $1,280,720. See attached Project Data Sheet for a location map and a Project summary. <br /> Staff Recommendation (Board approved Staff Recommendation on January 26, 2016) <br /> Staff recommends the Board approve a loan not to exceed $151,500 ($150,000 for Project costs and <br /> $1,500 for the 1% Loan Service Fee) to the Orchard Ranch Ditch Company for the Orchard Ranch Ditch <br /> Piping Project from the Severance Tax Perpetual Base Fund. Loan terms shall be 30 years at a blended <br /> rate of 1.95% per annum. Security for the loan shall comply with CWCB Financial Policy #5. <br /> ot. c oto <br /> Interstate Compact Compliance •Watershed Protection • Flood Planning Et Mitigation • Stream 8 Lake Protection <br /> Water Project Loans a Grants •Water Modeling • Conservation Et Drought Planning • Water Supply Planning ; o <br /> `.*. 876.`-' <br />
The URL can be used to link to this page
Your browser does not support the video tag.