Laserfiche WebLink
AGENCY NAME: Water Conservation Board <br /> AGENCY NUMBER: PDA <br /> ROUTING NUMBER: CJ J <br /> $300,000 <br /> • : N CONTRACT <br /> T TC , .�' <br /> ade this N day of� �t c O_ eci�3 13T, by <br /> and be the State of Colorado for the use and benefit of thejDepartment of Natural <br /> Resources, Colorado Water Conservation Board (CWCB), hereinafter referred to as the STATE, <br /> and The Agricultural Ditch and Reservoir Company, a Colorado nonprofit ctrporation, 12860 <br /> W. Cedar Drive, Suite 102, Lakewood, CO 80228, hereinafter referred to a the BORROWER <br /> and/or CONTRACTOR. <br /> FACTUAL RECITALS <br /> 1. Authority exists in the law, and funds have been budgeted, appropriated an otherwise made <br /> available and a sufficient unencumbered balance thereof remains availabfor payment in <br /> Fund Number 424, Organization YYYY, Appropriation L97, GBL AGRI, Program WTRC, <br /> Object Code 5120, Reporting Category: 3769, Contract Encumbrance Number C153769. <br /> 2. Required approval, clearance, and coordination have been accomplishes from and with <br /> appropriate agencies. <br /> 3. Pursuant to the provisions of §§ 37-60-119 and 37-60-120, 15 C.R.S. (1997) the STATE is <br /> authorized to loan money for the construction of water projects for the benefit of the people of <br /> the STATE, provided that the borrower assures repayment of that money. <br /> 4. The BORROWER is a duly constituted Colorado nonprofit corporation formed under and <br /> governed by Articles 20 through 29 and Article 42 of Title 7, C.R.S. (1997), located in <br /> Jefferson County, State of Colorado. <br /> 5. The BORROWER has applied to the STATE for a loan to be used for financing and/or <br /> refinancing the rehabilitation of portions of the BORROWER'S Welch Ditch and Agricultural <br /> Ditch Systems, including the construction of three pump stations, hereinafter referred to as <br /> PROJECT, at an estimated total cost of$600,000. <br /> 6. The STATE has reviewed a feasibility report prepared by Bishop.Brogden Associates <br /> Engineers, which is incorporated herein by reference, and, based upon this feasibility report, <br /> the STATE determined the PROJECT to be technically and financially feasible. <br /> 7. At its November 25, 1996 meeting, the CWCB approved a loan to theORROWER in an <br /> amount not to exceed $300,000 (up to 75% of the cost of the PROJECT) at An interest rate of <br /> 5.25% per annum for a term of thirty years. <br /> 8. Pursuant to 1997 Colo. Sess. Laws, Ch. 168, Section 1(1)(f), the G neral Assembly <br /> authorized the CWCB to loan to the BORROWER an amount not to exceed $3 0,000 to finance <br /> and/or refinance the costs of the PROJECT. <br /> The Agricultural Ditch and Reservoir Company Page 1 of 14 Loan Contract <br />