My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-174 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-174 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 8:18:02 AM
Creation date
12/18/2015 9:55:35 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-174
Contractor Name
Uncompahgre Valley Water Users Association
Contract Type
Loan
County
Montrose
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> Execution Version <br /> financing or refinancing thereof or pprchasing equity ownership interests of <br /> Seller, any trustee or agent acting on their behalf, and any Person providing <br /> interest rate protection agreements to hedge any of 'the foregoing debt <br /> obligations. <br /> ti9 '.'Firs}Commercial Operation Date" means flys Cojnmercial Operation Date of <br /> thefirst of the Units til be placed into Coir mercial`Operation. <br /> 2.10 'Inteicanne tiot*Fai Ies"Means ail of the necessasyelecttkal Interconnellian <br /> and related fathitties'hat are required to be installed or modified by Seiler or <br /> Buyer, as applicable, for the purpose of interconnecting each Unit to_Buyer's <br /> distribrition lines at each Site,which shall be set forth In greater detail In the <br /> interconnection Agreement between Seller and Buyer title Irate healon <br /> Agreement").lnte(conhiectlon Facilities hidude,tOt are not limited to;metering <br /> equipment, transformers and associated equipment, distribution tines and <br /> equipineht, communications and telemetering equipment, protective devices <br /> and safety equipment. <br /> 2.11 "i ie 6r+ 'isthe aggregate monthly energy generated by the Units and <br /> nieaCcured at tine InterconnecUon:Facgities. <br /> 2.12 "Output"means the net electric r and energy icy the <br /> tests,indudlngla)from Drop.'t, and(b),any increased-capacity ung5.001.011 <br /> 32,in-etther case,elf agreed to bq Buyer,and delivered bySellerto Buyer at ear* <br /> respective Point of COM*, measgra0 to m = !rs ("MWh) aati <br /> calculated es shown In Eichibit 3, attached hereto, arid made a part of this <br /> Agreemeht. <br /> 2.13 means any kicilvidual,corporation,per,Joint venture,Um*ed <br /> naby company, association, joint stock company, 'trust, unincorporated <br /> orgafizatlon.entity,-government or other political subdivision. <br /> 2.14 "Point of Delivery" shall mean, with respect to each Unit, the sxiint of <br /> interconnection at the high voltage onnection of each tlit steed-up transformer <br /> and Buyer's 044100 system as shown ion Ez'hli t 6,shed hereto, airs! <br /> made a keit of this Atreeihierâ–º3. <br /> 215 'VW meaner v h re*:t V,each UnR,the real ppetty thrh w hick the Unhand <br /> Sele?s lAterbOrtieetion Firs are located,as defined In Eirli bit 4,attached <br /> heretoaathtd made a part&fthis Agreement. <br /> 2.16 "'tri-Sate`Means Tri-State Generation and Transmission Association,Inc, <br /> Page 3of14 <br /> 131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.