My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-174 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-174 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 8:18:02 AM
Creation date
12/17/2015 3:06:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-174
Contractor Name
Uncompahgre Valley Water Users Association
Contract Type
Loan
County
Montrose
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
15. Operation of PROJECT. The BORROWER shall, without expense or legal liability to the <br /> CWCB, manage, operate, and maintain the PROJECT continuously in an efficient and <br /> economical manner. <br /> 16. BORROWER'S Liability Insurance. <br /> a. Upon execution of this CONTRACT and continuing until complete repayment of the <br /> loan is made to the CWCB, the BORROWER shall maintain commercial general <br /> liability insurance, with a Association that is satisfactory to the CWCB, with <br /> minimum limits of $1,000,000 combined single limit for each occurrence and <br /> $2,000,000 general aggregate, including products/completed operations and <br /> personal injury. <br /> b. Prior to the disbursement of any loan funds, the BORROWER shall provide the <br /> CWCB with an Acord Form 25 evidencing said insurance and shall provide the <br /> CWCB with documentation of renewals of said insurance. <br /> 17.Additional Contract Requirements. Any additional contract requirements are set <br /> forth in Additional Conditions & Contract Requirements (Section 7) of the PROJECT <br /> SUMMARY. <br /> B. PROJECT PROVISIONS <br /> 1. Construction Fund Program Procedures. During the completion of the PROJECT, <br /> the BORROWER shall adhere to the CWCB Construction Fund Program Procedures <br /> (Section 9), of the PROJECT SUMMARY. <br /> 2. Eligible Expenses. The PROJECT expenses for which the BORROWER is eligible for <br /> loan disbursements are listed in Eligible Expenses (Section 10) of the PROJECT <br /> SUMMARY. <br /> 3. Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br /> Disbursement Schedule (Section 11) of the PROJECT SUMMARY. <br /> 4. Time for Performance. The BORROWER recognizes that time is of the essence in the <br /> performance of all of its obligations under this CONTRACT. Therefore, the BORROWER <br /> shall complete the PROJECT within the time specified in Time for Performance (Section <br /> 12) of the PROJECT SUMMARY. <br /> 5. Indemnification by the Construction Firm. The BORROWER shall require all <br /> Construction Firms and their subcontractors to indemnify the State and the <br /> BORROWER against all liability and loss, and against all claims and actions based upon <br /> or arising out of damage or injury, including death, to persons or property, caused by <br /> any acts or omissions of those parties or sustained in connection with the <br /> performance of any contract related to the PROJECT or by conditions created thereby, <br /> or based upon any violation of any statute, ordinance, or regulation, and the defense <br /> of any such claims or actions. <br /> 6. Liability Insurance during Construction. During construction of the PROJECT, the <br /> BORROWER shall require the construction contractor and any subcontractors to <br /> maintain the following insurance coverage, in the limits shown, during the term of their <br /> Page 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.