My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-022 Increase Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-022 Increase Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 9:30:48 AM
Creation date
11/23/2015 12:14:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-022
Contractor Name
Greeley and Loveland Irrigation COmpany
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Greeley and Loveland Irrigation Company Consent Agenda Item 1a <br /> November 18-19, 2015 Board Meeting(Updated November 20, 2015) <br /> Page 3 of 5 <br /> TABLE 2: STORAGE WATER RIGHTS <br /> Name Storage (AF) Appropriation Date Adjudication Date <br /> Greeley and Loveland Reservoir 14,238.7 - 1/14/1893 6/29/1916 <br /> Seven Lakes Reservoir System' 8,432.0 4/28/1902 6/29/1916 <br /> Boyd Lake 48,564.0 4/28/1902 6/29/1916 <br /> Greeley and Loveland Reservoir 14,239.0 1/14/1893 6/27/1978 <br /> Seven Lakes Reservoir System 8,432.0 4/28/1902 6/09/1978 <br /> Boyd Lake 44,031.2 4/28/1902 6/27/1978 <br /> 1 Includes Horseshoe Lake as well as Westerdoll Lake, Hoffman Reservoir, a Heinricy Reservoir <br /> Average annual diversions are 45,000 AF. <br /> Project Update <br /> Boyd Lake <br /> The construction contract for the Boyd Lake High-Level Outlet Structure was awarded to Moltz <br /> Constructors in December 2014 and construction occurred from January 2015 to May 2015. The <br /> construction contract exceeded the engineer's final design estimate by $33,587. Construction was <br /> completed on schedule and included two change orders totaling $24,090. <br /> Horseshoe Phase 1 <br /> Horseshoe Phase 1 included the installation of the high-level outlet gate. The Company agreed to allow <br /> Larimer County's contractor to install the gate as a part of the County's adjacent spillway box culvert <br /> and county road bridge replacement project. Therefore Phase 1 was performed by the County and its <br /> selected contractor, with the Company reimbursing the County for work associated with the gate. <br /> Construction was completed over schedule resulting in an increased construction cost of $116,737 and <br /> increased construction observation cost of $188,260. <br /> Horseshoe Phase 2A & 2B <br /> Horseshoe Phase 2 includes connecting the new high-level outlet gate installed in Phase 1 into Boyd <br /> Lake. The construction contract was awarded to Moltz Constructors in March 2015. In cooperation with <br /> Boyd Lake State Park, it was agreed to build Phase 2 in two phases to avoid summertime construction. <br /> Phase 2A consisted of the outfall into Boyd Lake and was constructed between March 2015 and June <br /> 2015. Phase 2B consists of tying the gate built in Phase 1 into the Boyd Lake outfall built in Phase 2A. <br /> Construction began in September 2015 and is on schedule for completion in December 2015. After work <br /> was nearly complete on Phase 2A, a miscalculation in excavation amounts, additional select fill, and <br /> additional rip-rap were discovered in the contract documents resulting in a change order in the amount <br /> of $189,300. Additionally, the splitting of Phase 2 into two phases resulted in a change order in the <br /> amount of $88,658. <br /> The current cost estimate is shown in Table 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.