My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-022 Increase Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-022 Increase Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 9:30:48 AM
Creation date
11/23/2015 12:14:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-022
Contractor Name
Greeley and Loveland Irrigation COmpany
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DNR COLORADO 1313 Sherman Street John Hickenlooper, Governor <br /> Denver, CO 80203 <br /> CO Colorado Water Mike King, DNR Executive Director <br /> Conservation Board P (303) 866-3441 <br /> Department of Naturat Resources F(303)866-4474 James Eklund, CWCB Director <br /> TO: Colorado Water Conservation Board Members <br /> FROM: Jonathan Hernandez, P.E., Project Manager <br /> Kirk Russell, P.E., Finance Section Chief <br /> DATE: November 18-19, 2015 Board Meeting (Updated November 20, 2015) <br /> CONSENT AGENDA ITEM: la - Change to Existing Loans <br /> Greeley and Loveland Irrigation Company - Irrigation System Improvements <br /> Guidance <br /> At the May 2005 Board Meeting, the Board authorized staff to present as Consent Agenda items <br /> increases to existing loans that are less than 20% of the original loan request. This request is for an <br /> increase of 19% of the original loan amount. <br /> Introduction <br /> The Greeley and Loveland Irrigation Company (Company) received approval of a $3,154,230 CWCB loan <br /> (CT2015-022) at the September 2013 Board Meeting to finance the Irrigation System Improvements <br /> (Project). The purpose of the Project is to meet the State Engineer's Office Dam Safety Branch <br /> requirements, improve water management efficiencies, reduce high maintenance costs, and prevent <br /> continued outlet deterioration at Boyd Lake and Horseshoe Lake Reservoirs. The Project was split into <br /> four phases: Boyd Lake, Horseshoe Phase 1, Horseshoe Phase 2A, and Horseshoe Phase 2B. The <br /> Company has completed all phases except Horseshoe Phase 2B which is currently under construction. <br /> Final Project costs are estimated to exceed the original loan application estimate by 19%. The <br /> Company is requesting a loan increase for 90% of the increased Project costs. See attached Project <br /> Data Sheet for a location map and Project summary. <br /> Staff Recommendation (Board approved Staff Recommendation on November 18, 2015) <br /> Staff recommends the Board approve a loan increase of $590,850 ($585,000 for Project cost and $5,850 <br /> for the 1% Loan Service Fee), for a total loan not to exceed $3,745,080 ($3,708,000 for Project cost and <br /> $37,080 for the 1% Loan Service Fee) to the Greeley and Loveland Irrigation Company for engineering <br /> and construction costs related to the Irrigation System Improvements Project, from the Construction <br /> Fund. The loan terms shall remain 30 years at a blended interest rate of 2.15% per annum. Security for <br /> the loan shall be in compliance with CWCB Financial Policy#5. <br /> cat co, ,� <br /> Interstate Compact Compliance • Watershed Protection • Flood Planning a Mitigation • Stream a Lake Protection <br /> Water Project Loans a Grants •Water Modeling • Conservation a Drought Planning •Water Supply Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.