Laserfiche WebLink
DNR COLORADO 1313 Sherman Street John Hickenlooper, Governor <br /> 1j Denver, CO 80203 <br /> CO Colorado Water Mike King, DNR Executive Director <br /> Conservation Board P (303)866-3441 <br /> Department of Natural Resources F(303)866-4474 James Eklund, CWCB Director <br /> TO: Colorado Water Conservation Board Members <br /> FROM: Jonathan Hernandez, P.E., Project Manager <br /> Kirk Russell, P.E., Finance Section Chief )46- _ <br /> DATE: November 18-19, 2015 Board Meeting (Updated November 20, 2015) <br /> AGENDA ITEM: 8a - Change to Existing Loans <br /> Lake Canal Reservoir Company - North Gray Reservoir Rehabilitation <br /> Introduction <br /> The Lake Canal Reservoir Company (Company) received approval of an $116,625 CWCB loan <br /> (CT2015-042) at the September 2011 Board Meeting to finance the North Gray Reservoir Rehabilitation <br /> (Project). The purpose of the Project is to remove the storage restriction imposed by the State <br /> Engineer's Office Dam Safety Branch by replacing the existing spillway. As a result of final design and <br /> further investigation, the scope of the Project increased to include modifications to North Gray <br /> Reservoir's outlet and the interconnect structure between North and South Gray Reservoirs. Bids were <br /> received in September 2015 and the Company is requesting a loan increase for approximately 60% of <br /> the updated Project Cost, estimated to be $334,750. See attached Project Data Sheet for a location <br /> map and Project summary. <br /> Staff Recommendation (Board approved Staff Recommendation on November 18, 2015) <br /> Staff recommends the Board approve a loan increase of $87,673 ($86,805 for Project cost and $868 for <br /> the 1% Loan Service Fee), for a total loan not to exceed $204,298 ($202,275 for Project cost and $2,023 <br /> for the 1% Loan Service Fee) to the Lake Canal Reservoir Company for Project costs related to the <br /> North Gray Reservoir Rehabilitation Project, from the Construction Fund. The loan terms shall remain <br /> 30 years at a blended restricted reservoir interest rate of 2.10% per annum. Security for the loan shall <br /> be in compliance with CWCB Financial Policy#5. <br /> Interstate Compact Compliance•Watershed Protection • Flood Planning 8 Mitigation • Stream a Lake Protection 7;e/ 0' <br /> Water Project Loans a*Grants •Water Modeling• Conservation 8 Drought Planning •Water Supply Planning <br /> !_876 <br />