Laserfiche WebLink
ILower South Platte River Study <br /> Colorado Water Conservation Board <br /> IDecember 2001 <br /> • Overall, the project would benefit from modernization and rehabilitation of all <br /> I existing facilities to more closely meet present-day standards for embankment <br /> dams <br /> IThe above-noted concerns would be addressed during the design of major <br /> rehabilitations or enlargements of the dams and reservoir. <br /> IIn 1998, Wheeler-Kumar completed a feasibility study of rehabilitating and <br /> enlarging Julesburg Reservoir. That study included an evaluation of three basic <br /> Ialternatives and several variations, as summarized below: <br /> Alternative A - No increase in storage capacity; minimal rehabilitation of Dam 1 <br /> IAl - Rehabilitate Dam 1 <br /> A2 - Rehabilitate and reconstruct Dams 1, 1A, 2, 3, and 4 (Dike) <br /> IAlternative B Increase storage capacity by 5,300 acre-feet. Raise,rehabilitate <br /> and reconstruct Dams 1, 1A, 2, 3, 4 (Dike), 4, 5, and appurtenant <br /> Istructures. <br /> Alternative Cl Raise, rehabilitate and reconstruct Dams 1, 1A, 2, 3, 4 (Dike), 4, <br /> I5, and appurtenant structures. Increase storage by 10,100 acre- <br /> feet. <br /> I Alternative C2 Raise, rehabilitate, and reconstruct Dams 1, 1A, 2, 3, 4(Dike),4, <br /> 5, and appurtenant structures. Dam 2 is replaced with a new <br /> structure. Increase storage by 10,800 acre-feet. <br /> I Alternative C3 Raise, rehabilitate, and reconstruct Dams 1, 1A, 2, 3, 4 (Dike),4, <br /> 5, and appurtenant structures. Dams 1 A, 2, and 3 are replaced <br /> with a new dam located downstream to provide more storage. <br /> IIncrease storage by 21,900 acre-feet. <br /> I Cost estimates presented in the Wheeler-Kumar Report (1998) are summarized below and <br /> updated to 2001 price levels: <br /> I Alternative Additional Storage t't 1998 Cost t21 2001 Cost(z) Unit Cost <br /> (AF) ($) ($) ($/AF) <br /> Al 0 _ $381,000 $430,000 --- <br /> I A2 0 $8,015,000 <br /> $12,583,000 $8,820,000 — <br /> B 5,300 $13,800,000 $2,610 <br /> C1 10,100 $14,962,000 $16,100,000 $1,590 <br /> C2 10,800 $17,851,000 $19,500,000 $1,810 <br /> IC3 21,900 $22,962,000 $25,100,000 $1,150 <br /> (1) Over and above the 22,900 acre-feet of existing storage. <br /> I (2) From Wheeler-Kumar report dated March 1998. <br /> (3) Evaluation at approximately 3 percent per year over three years;added 10 percent to 1998 cost and rounded. <br /> IGEI Consultants, Inc. 4-10 01002 Dec 2001 Lower South Platte River Study <br />