My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lower South Platte River Study
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
Lower South Platte River Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2015 10:59:50 AM
Creation date
11/20/2015 10:58:59 AM
Metadata
Fields
Template:
Loan Projects
Contractor Name
Colorado Water Conservation Board
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ILower South Platte River Study <br /> Colorado Water Conservation Board <br /> IDecember 2001 <br /> Table 3-1 <br /> Overview of Permitting Requirements <br /> IFederal Laws,Regulations,Permitting Requirements <br /> National Environmental <br /> Policy Act(NEPA) Responsible Agency Type of Permit/Action Required Description <br /> National Environmental Lead Federal Agency to be Environmental Impact Statement Comprehensive,lengthy process that <br /> Policy Act(NEPA) determined (EIS) provides an analysis of the potential impacts <br /> to the human and natural environment. <br /> I Clean Water Act(CWA) U.S.Army Corps of Engineers 404 Permit Authorizes discharge of fill materials into <br /> (COE) wetlands. All practicable alternatives must <br /> be investigated and impacts must be <br /> mitigated. <br /> I National Historic <br /> Preservation Act State Historic Preservation `Addressed in EIS process. Ensures the protection of historic sites and <br /> Office other cultural resources. Impacts to <br /> properties listed on National Register of <br /> Historic Places must be assessed as well as <br /> any potential on-site cultural resources. <br /> I Endangered Species Act U.S.Fish and Wildlife Service Biological Opinion by USFWS Federal action must not jeopardize the <br /> (ESA) (USFWS) continued existence of threatened and <br /> endangered(T&E)species. <br /> Fish and Wildlife U.S.Fish and Wildlife Service *Addressed in EIS process. Ensures that existing fish and wildlife <br /> I Coordination Act(FWCA) (USFWS) resources affected by reservoir including <br /> State species of concern will be conserved. <br /> USFWS will coordinate FWCA review and <br /> any necessary mitigation with the Colorado <br /> Division of Wildlife. <br /> I State Laws,Regulations,and Permitting Requirements <br /> Law/Regulation Responsible Agency or Type of Permit/Action Required <br /> Agencies Description <br /> Clean Water Act Colorado Department of Public 401 Certification Issuance of the Corps 404 Permit requires <br /> I Health and Environment <br /> (CDPHE) approval from the state under Section 401 <br /> of the CWA. The state ensures that the <br /> reservoir will comply with applicable water <br /> quality standards. <br /> I Mined Land Reclamation Mined Land Reclamation <br /> Act Board Mined Land Reclamation Permit Authorizes extraction of earth fill materials <br /> for use in dam construction. Permit not <br /> needed if materials are located and <br /> transported within project area. <br /> State Engineer's Dam State Engineer's Office Construction Permit Reservoir and dam engineering design must <br /> I Certification be approved by the State Engineer. <br /> State Threatened and Colorado Division of Wildlife *Addressed in EIS and FWCA Colorado Division of Wildlife maintains list of <br /> Endangered Species process state T&E species. Reservoir impacts to <br /> these species must be addressed in EIS <br /> t process. <br /> Instream Flow Program Colorado Water Conservation Inundation Rules If reservoir inundates an ISF right,approval <br /> Board of the Colorado Water Conservation Board <br /> is required. <br /> Air Quality Program CDPHE Land Development Permit Dust generated during construction of the <br /> I dam and reservoir must be controlled. Land <br /> development and permit requires <br /> submission of dust control plan. This permit <br /> would be obtained by construction <br /> contractor prior to construction. <br /> I County Laws,Regulations,and Permitting Requirements <br /> Law/Regulation Responsible Agency or Type of Permit/Action Required <br /> Agencies Description <br /> Other Counties—1041 Respective County 1041 Permit Most County 1041 Regulations are a <br /> I Regulation Commissioners component of the Comprehensive Master <br /> Plan. The 1041 permit requirements are <br /> similar to an EIS and would be conducted in <br /> parallel to the EIS process. <br /> Construction County Addressed in 1041 process Construction noise,dust,traffic,etc.will be <br /> addressed during 1041 process <br /> I <br /> IGEI Consultants, Inc. 3-2 01002 Dec 2001 Lower South Platte River Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.