My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Grant Application
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Grant Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 12:37:19 PM
Creation date
11/11/2015 10:08:31 AM
Metadata
Fields
Template:
Water Supply Protection
Description
documents related to River Pretoection Workgroup (RPW) Steering Committee
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/30/2008
Author
RPW
Title
Grant Application
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5b. Please indicate which program your project will benefit most AND describe its relationship to local <br /> water planning and to the MEGA Board-energy and mineral development: <br /> X Water Supply Protection Program' <br /> Water Supply Planning and Finance Program <br /> X Stream and Lake Protection Program2 <br /> Conservation and Drought Planning Program <br /> Flood Protection Program <br /> Water Information Program <br /> Other(Please describe): <br /> Relationship Description: <br /> See Attachment "A",particularly Sections 1 and 5. <br /> 'This collaborative community process will protect compact entitlements while assisting to forward the <br /> CWCB goal of stream protection. <br /> 2This collaborative community process will protect stream values while allowing needed water <br /> development to go forward. <br /> 6b. Please list the names and address of technical or legal consultants retained to represent the <br /> applicant or to conduct investigations for the proposed study/demonstration project: <br /> Name Address and Phone <br /> Marsha Porter-Norton-P.O.Box 4506,Durango,CO 81302;970-247-8306(facilitator,as opposed to legal or <br /> trrhninal nnncnitantl <br /> 7b. List any feasibility study or scope of study that has been completed,or is in progress, for the <br /> proposed study/demonstration project.(Please submit one copy with this application): <br /> See Attachment "A" <br /> 8b. What is the estimated cost of the study/demonstration project? Please include estimated Study, <br /> Planning,Engineering,and Construction costs,if known: <br /> Estimated Planning/Study Costs: $ See Attachment "A" <br /> Estimated Engineering Costs: $N/A <br /> Estimated Construction Costs: $N/A <br /> Estimated Total Costs: $ 80,000 00 <br /> 9b. How much funding are you requesting? $ 20,000 00 <br /> Grant Application—Severance Tax Trust Fund Operational Account-Fiscal Year 2008-2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.