My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Scope of Work from Marsha Porter-Norton
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Scope of Work from Marsha Porter-Norton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2015 10:08:20 AM
Creation date
11/11/2015 10:08:20 AM
Metadata
Fields
Template:
Water Supply Protection
Description
documents related to River Pretoection Workgroup (RPW) Steering Committee
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/18/2013
Author
Dolores Water Conservancy District
Title
Scope of Work from Marsha Porter-Norton
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The River Protection Workgroup Regional Discussion <br /> (This is for information only and does not describe the work being done under this scope of work) <br /> The Regional Discussion will: <br /> • draw on the work done by the local Public Workgroups and develop, if possible, a consensus <br /> approach(es) to protection of rivers and river segments in the region while allowing water <br /> development to continue; <br /> • honor and include the discussions, recommendations and conclusions of the 5 local River <br /> Protection Workgroups; <br /> • be an inclusive process where the local Public Workgroups will remain informed and involved; <br /> • involve the RPW Steering Committee looking carefully at the work done by the five local <br /> Workgroups to see if there are any potential next steps and ideas that could be explored across <br /> the five basins; <br /> • be based on the river specific Workgroups: their consensus recommendations; their issues and <br /> concerns;their ideas; and <br /> • be considered Phase II of the RPW effort, with a target date for completion of summer 2014. <br /> The Regional Discussion will be a carried out through: <br /> • remaining flexible; <br /> • the RPW Steering Committee developing an initial set of draft ideas and these ideas will then be <br /> discussed at the Public Workgroup level; <br /> • using the transparent, inclusive and collaborative principles and process steps that the Public <br /> Workgroups use; <br /> • continued funding from a variety of stakeholders; <br /> • understanding that various forms of dialogue and problem solving may be needed, including <br /> negotiations or mediation;and <br /> • striving towards consensus, communication and transparency with the Public Workgroups <br /> throughout all steps and phases. <br /> Approved by the RPW Steering Committee on July 24,2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.