My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Glenwood Springs Field Office Recreation Appendix Working Draft
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Glenwood Springs Field Office Recreation Appendix Working Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 2:21:12 PM
Creation date
11/10/2015 4:07:56 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Related to Upper Colorado River Wild and Scenic Stakeholder Group
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/6/2009
Author
BLM, GSFO
Title
BLM Glenwood Springs Field Office Recreation Appendix Working Draft
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Working Draft—GSFO Recreation Appendix- 3-6-2009 <br /> Management Controls:A moderate degree of visitor and land use controls exercised. BLM on-site presence is <br /> low away from trailheads. <br /> Administrative, Management, information, and Monitoring Support Actions <br /> Support actions are aligned to facilitate: 1. the targeted recreation activities;2. the proposed RSCCs;3. the <br /> realization of the outcome objective);and;;4. address visitor safety, resource protection and/or use/user <br /> conflicts. The identified allowable uses(AU)and management actions(MA)are land use plan level decisions. <br /> The corresponding implementation actions(IA)complete the planning framework however they are not subject <br /> to protest under the planning regulations but are subject to administrative review as prescribed by program <br /> specific regulations. <br /> Administrative and Management Support Actions <br /> Access: <br /> • Develop additional access(e.g.Aspen Glen and/or Cattle Creek/Crystal Springs Road)(IA). <br /> Agreements: <br /> • Administer the area under a Memorandum of Understanding between the Red Hill Council and the BLM <br /> GSFO that outlines administrative roles and responsibilities(IA). <br /> Camping: <br /> • The SRMA is closed to camping and overnight use(AU). <br /> Comprehensive Trails and Travel Management: <br /> • Motorized and mechanized travel is limited to designated routes(MA). <br /> • Non-motorized modes of travel (e.g.,foot,equestrian, pack stock;also wheelchairs)are not limited to <br /> designated routes or areas(MA). <br /> • Administrative use authorizations will be granted on a case-by-case basis(MA). <br /> • In areas with limited travel designations, allow motorized/mechanized travel up to 300 feet from <br /> designated motorized/mechanized routes for direct access to dispersed campsites provided that: 1)no <br /> resource damage occurs;2)no new routes are created; and 3)such access is not otherwise prohibited <br /> (MA). <br /> • Cross-country motorized/mechanized travel for big game retrieval is prohibited. Hand-held wheeled <br /> game retrieval carts are allowed(MA). <br /> • Over-the-snow travel is prohibited(MA) <br /> • Except for the Mushroom Rock area,the SRMA is closed to motorized and mechanized travel from <br /> December 1 to April 15 to protect wintering big game species(MA). <br /> • Maintain the existing trail system and construct new trails only to connect to new access points(MA). <br /> Alternatives C. <br /> • Construct new sustainable mountain bike trails on the northside to create a few more loop trails and make <br /> trail connections to new access points(MA).Alternatives B and D. <br /> Firearm Use Restriction: <br /> • The discharge of firearms for recreational target shooting is prohibited in developed recreation sites <br /> (AU). <br /> Forestry: <br /> • The SRMA is closed to timber harvest,firewood cutting and special forest product harvest(AU). <br /> Funding: <br /> • As one part of a comprehensive funding strategy to support recreation sites and services,the BLM(with <br /> partner support)may charge fees for standard or expanded amenity recreation sites and services <br /> defined in the Recreation Enhancement Act(IA). <br /> Implementation: <br /> • With stakeholder involvement, apply adaptive management(e.g. Limits of Acceptable Change)which <br /> focuses on a cycle of designing-implementing-monitoring-evaluating-adjusting implementation actions to <br /> respond to future recreation issues and the results of monitoring (MA). <br /> Lands and Realty: <br /> • ROW avoidance areas are applied to the SRMA(AU).Alternatives B&C <br /> • ROW avoidance areas are applied to developed recreation sites(AU). <br /> • The SRMA is retained for long-term management(MA). <br /> • Developed recreation sites are retained for long-term management(MA). <br /> Page I 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.