My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Outline of Wild & Scenic Alternative Mang. Plan
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Outline of Wild & Scenic Alternative Mang. Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 2:25:50 PM
Creation date
11/10/2015 4:07:52 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Related to Upper Colorado River Wild and Scenic Stakeholder Group
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/8/2008
Author
Upper Colorado River Wild and Scenic Stakeholder Group
Title
Outline of Wild & Scenic Alternative Mang. Plan
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b. ESA Flow Deliveries. <br /> c. CWCB Instream Flow Protection. See above. <br /> d. Voluntary Flow Management. See above <br /> 2. Management Activities in Response to General Changes in Baseline <br /> Conditions Over Time. <br /> fAvioy ) /���/��i a0. a. When it becomes evident from the results of the monitoring <br /> �u 't U � Y activities that an ORV may be subject to different conditions that <br /> l R l might result in less protection of the ORV,the SG will <br /> ( I A.) no implement Additional Management Measures(as identified in <br /> the management plan as flow-based, land-based, or water quality <br /> C 1(\A-t (n(V protection measures and/or measures identified at the time to <br /> address the particular issue)focused upon improving the <br /> condition of ORV. The management measure utilized will <br /> depend upon the identified cause for the reduction in the <br /> t <br /> LA <br /> �/t 6 protection level of the ORV and the management actions <br /> available to the SG. [expand?] <br /> 3. Measures to Provide Flexibility During Extreme Drought Conditions: <br /> [e.g., can flexibility be added that recognize the additional reduction of <br /> flows below the target levels for a limited duration during extreme <br /> drought conditions?] <br /> 4. Enhancement/Rehabilitation measurements. <br /> a. If the monitoring demonstrates a degradation of the ORVs that is <br /> caused by the failure to meet the flow targets, should the SG <br /> Plan provide rehabilitation measures(e.g.,increased flows) <br /> through voluntary flow management measures if possible <br /> without adversely impacting water project yield? <br /> VII. Water Quality Based Protection Measures. <br /> Page 14 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.