My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2001 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2001 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2015 12:49:03 PM
Creation date
11/4/2015 12:48:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2001
Contractor Name
Tunnel Water Company, The
Contract Type
Loan
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: THE TUNNEL WATER AGENCY NAME: COLORADO WATER <br /> COMPANY CONSERVATION BOARD <br /> REQUESTED LOAN AMOUNT: $1,100,000 CONTRACT TYPE: LOAN/PRIVATE <br /> LOAN ORIGINATION FEE: $11,000 CMS: 83655/CORE: CT2016-2001 <br /> TOTAL LOAN AMOUNT: $1,111,000 <br /> LOAN CONTRACT <br /> This contract ("CONTRACT" or "LOAN CONTRACT")) is made between the State of <br /> Colorado for the use and benefit of The Department of Natural Resources, Colorado <br /> Water Conservation Board ("CWCB" or "State"), and The Tunnel Water Company, 2319 <br /> E. Mulberry St., Fort Collins, Colorado 80524 ("BORROWER"), a mutual ditch company and <br /> nonprofit corporation. <br /> FACTUAL RECITALS <br /> 1. CWCB authority exists in the law, and funds have been budgeted, appropriated and <br /> otherwise made available and a sufficient unencumbered balance thereof remains <br /> available for encumbering and subsequent payment of this CONTRACT; and <br /> 2. Required approval, clearance, and coordination have been accomplished from and <br /> with appropriate agencies; and <br /> 3. On September 17, 2015 the CWCB approved a loan request from the BORROWER for <br /> the Laramie-Poudre Tunnel Rehabilitation Project ("PROJECT") to extend the service <br /> life of the tunnel and improve maintenance access. The total estimated project cost is <br /> $1,225,000. The total loan amount of $1,111,000 which includes a one percent (1%) <br /> loan origination fee of $11,000 is payable over 30 years at an interest rate of 2.55%; <br /> and <br /> 4. The PROJECT SUMMARY, attached as APPENDIX 1, and incorporated herein contains <br /> BORROWER Information (Section 1), the PROJECT Description (Section 2), CWCB's <br /> authority for making this loan (Section 3), and CWCB Approval or Legislative <br /> Authorization (Section 4), identifying the amount of the loan and the terms of <br /> repayment. The PROJECT SUMMARY also contains sections on BORROWER'S debt, <br /> collateral, procedures and eligible expenses. <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this <br /> PROJECT upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained <br /> herein, the parties agree as follows: <br /> A. LOAN PROVISIONS <br /> 1. Loan Origination Fee. The amount of the loan (LOAN AMOUNT) shall include (1) the <br /> amount of the funds loaned by the CWCB to the BORROWER for the PROJECT and (2) <br /> a loan origination fee of one percent (1%) of the PROJECT amount. In the event that <br /> the BORROWER does not use the full LOAN AMOUNT authorized, the parties shall <br /> amend this CONTRACT or exercise an OPTION LETTER (as outlined in section A.3b. <br /> Page 1 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.