Laserfiche WebLink
Project Summary — Centennial Water and Sanitation District <br /> Contract Number CT2016-2056 (C150405C) <br /> SECTION 1 —BORROWER INFORMATION <br /> Name: Centennial Water and Sanitation District <br /> Type of Entity: A Colorado Title 32 Special District <br /> Address: 62 West Plaza Drive, Highlands Ranch, CO 80129 <br /> Contact: Bruce Lebsack <br /> Phone Number: 303-791-0430 <br /> E-mail address: blebsack @highlandranch.org <br /> SECTION 2—PROJECT DESCRIPTION <br /> A. Description of PROJECT: This CONTRACT is to be used for the District's <br /> participation in the Chatfield Reallocation Project, specific to "off-site" <br /> "compensatory mitigation features" and "monitoring" as defined in the Agreement <br /> Between the Department of the Army and the Colorado Department of Natural <br /> Resources for Reallocation of Water Storage Space, Recreation Modifications, <br /> and Compensatory Mitigation Features at the Chatfield Dam and Reservoir, <br /> Colorado dated October 9, 2014, incorporated herein by reference is defined as <br /> the "PROJECT." The District's total participation cost is estimated to be $48,888,000. <br /> On May 22, 2014 the CWCB approved a total loan amount not to exceed <br /> $44,440,000 for the District's participation cost of the Chatfield Reallocation <br /> Project. The loan amount, for this CONTRACT, for these PROJECT activities, is <br /> $10,934,260, which includes a one percent (1%) loan service fee of $108,260 at <br /> an interest rate of 3.00% for 30 years. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study <br /> report dated August 2013 on the PROJECT, titled "CWSD Participation in the <br /> Chatfield Reservoir Reallocation Project,"which was prepared by Ryan Edwards, <br /> P.E. District Project Manager with support from Bruce Lebsack, District Finance <br /> Director, and Rick McLoud, District of Water Resources Manager and includes an <br /> alternative analysis, cost estimates, and financial statements. The feasibility study <br /> relies on the FR/EIS prepared by the Corps, and the Fish, Wildlife and <br /> Recreation Mitigation Plan (FWRMP) prepared by the Reallocation Participants <br /> in accordance with C.R.S. 37-60-122.2. Based upon the feasibility report, <br /> incorporated herein by reference, the CWCB determined the PROJECT to be <br /> technically and financially feasible. <br /> SECTION 3—CWCB's AUTHORITY <br /> Severance Tax Perpetual Base Fund: This loan is made pursuant to the provisions of <br /> §§ 39-29-109(1)(a)(I), 37-60-119 and 37-60-120, C.R.S., which authorize the CWCB to <br /> loan money for water projects from the Severance Tax Perpetual Base Fund for the <br /> benefit of the people of the state, provided that the BORROWER assures repayment of that <br /> Appendix 1 <br /> Page 1 of 5 <br />