Laserfiche WebLink
Project Summary — Center of Colorado Water Conservancy District <br /> Contract Number CT2016-2048 (C150406B) <br /> SECTION 1 —BORROWER INFORMATION <br /> Name: Center of Colorado Water Conservancy District <br /> Type of Entity: A Colorado Title 37 Water Conservancy District <br /> Address: 548 Front Street, Fairplay, Colorado, 80440 <br /> Contact: James Culichia <br /> Phone Number: 719-471-1212 <br /> E-mail address: jwc @fmcwater.com <br /> SECTION 2—PROJECT DESCRIPTION <br /> A. Description of PROJECT: the District's participation in the Chatfield <br /> Reallocation Project, specific to Chatfield Reallocation Project, for <br /> engineering, recreation facilities construction, on-site mitigation, off-site <br /> mitigation, and mitigation monitoring as defined in the Agreement Between the <br /> Department of the Army and the Colorado Department of Natural Resources <br /> for Reallocation of Water Storage Space, Recreation Modifications, and <br /> Compensatory Mitigation Features at the Chatfield Darn and Reservoir, <br /> Colorado dated October 9, 2014, incorporated herein by reference, is defined <br /> as the "PROJECT". This is part of a multi-year and multi-phased project. The <br /> total loan amount, for this CONTRACT, for these Project activities is $511,363, <br /> which includes a loan one percent (1%) loan service fee of $5,063 at an <br /> interest rate of 2.50% for 15 years; and <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study <br /> report dated March 13, 2014 on the PROJECT, titled "Loan Feasibility Report- <br /> Chatfield Reservoir Reallocation,"which was prepared by James Culichia, <br /> Attorney for the District and includes an alternative analysis, cost estimates, <br /> and financial statements. The feasibility study relies on the FR/EIS prepared <br /> by the Corps, and the Fish, Wildlife and Recreation Mitigation Plan <br /> (FWRMP) prepared by the Reallocation Participants in accordance with <br /> C.R.S. 37-60-122.2. Based upon the feasibility report, incorporated herein by <br /> reference, the CWCB determined the PROJECT to be technically and <br /> financially feasible. <br /> SECTION 3—CWCB's AUTHORITY <br /> Severance Tax Perpetual Base Fund: This loan is made pursuant to the provisions of <br /> §§ 39-29-109(1)(a)(I), 37-60-119 and 37-60-120, C.R.S., which authorize the CWCB to <br /> loan money for water projects from the Severance Tax Perpetual Base Fund for the <br /> benefit of the people of the state, provided that the BORROWER assures repayment of that <br /> money. <br /> Appendix 1 <br /> Page 1 of 4 <br />