My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2050 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2050 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2015 12:27:01 PM
Creation date
10/28/2015 10:40:09 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2050
C150404B
Contractor Name
Castle Pines North Metropolitan District
Contract Type
Loan
County
Douglas
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Engineering contracts and the plans and specifications must be submitted to the <br /> CWCB staff for verification of compliance with the terms of this CONTRACT when <br /> available prior to bidding. Any modifications, to the plans and specifications that <br /> effect changes to the construction costs must be approved in writing by CWCB. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br /> by § 37-87-105 C.R.S., the BORROWER shall provide or cause the entity that <br /> oversees construction of the Project to provide a letter of approval from the State <br /> Engineer's Office prior to construction. <br /> D. The BORROWER shall notify or cause the entity that oversees construction of the <br /> Project to notify CWCB of the bid opening date, time and location. CWCB staff <br /> may elect to attend the bid opening. <br /> E. CWCB must approve the award of the construction contract. <br /> F. The BORROWER shall contract or cause the entity that oversees construction of the <br /> Project to contract for the construction of the work with responsible and capable <br /> construction firms, which are found acceptable by the CWCB staff. <br /> G. The BORROWER must provide or cause the entity that oversees construction of the <br /> Project to provide a copy of the executed construction contract documents <br /> consisting of the contractor's proposal, construction contract, performance bond, <br /> payment bond, notice of award, notice to proceed, sample change order, and <br /> sample field order, as well as the advertisement for bid and bid bond at bidding. <br /> After the CWCB staff verifies that these documents comply with the terms of this <br /> CONTRACT, the BORROWER may issue or cause the entity that oversees <br /> construction of the Project to issue the notice to proceed to the construction firms. <br /> H. The BORROWER shall conduct or cause the entity that oversees construction of the <br /> Project to conduct a pre-construction conference at which time the CWCB staff <br /> shall have the opportunity to review and approve the construction schedule. <br /> I. If the CWCB staff determines that the PROJECT requires a resident inspector during <br /> construction, the BORROWER shall employ or cause the entity that oversees <br /> construction of the Project to employ an inspector who has been approved by the <br /> CWCB staff. <br /> J. The BORROWER shall construct or cause the entity that oversees construction of <br /> the Project to construct the PROJECT in accordance with the approved plans and <br /> specifications. <br /> K. Upon completion of the PROJECT construction, the BORROWER shall provide or <br /> cause the entity that oversees construction of the Project to provide as-built <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., <br /> the BORROWER shall provide or cause the entity that oversees construction of the <br /> Project to provide the as-built drawings to the State Engineer's Office for approval <br /> Appendix 1 <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.