My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2049 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2049 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2015 12:27:09 PM
Creation date
10/28/2015 10:39:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2049
C150404A
Contractor Name
Castle Pines North Metropolitan District
Contract Type
Loan
County
Douglas
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary ® Castle Pines North Metropolitan District, acting by <br /> and through its Water Activity Enterprise <br /> Contract Number CT2016-2049 (C150404A) <br /> SECTION 1 —BORROWER INFORMATION <br /> Name: Castle Pines North Metropolitan District, acting by and <br /> through its Water Activity Enterprise <br /> Type of Entity: The Castle Pines North Metropolitan District is a Colorado <br /> Title 32 Special District formed pursuant to and governed <br /> by Title 32, Article 1, C.R.S. The Castle Pines North <br /> Metropolitan Water Enterprise is operated and maintained <br /> pursuant to Article 45.1, Title 37, C.R.S. and was formed <br /> and is operated as an enterprise within the meaning of <br /> Colorado Const. Art. X, Section 20. <br /> Address: 7404 Yorkshire Drive, Castle Pines, CO 80108 <br /> Contact: Peggy Dowswell-Finance Director <br /> Phone Number: 970-669-3611 <br /> E-mail address: peggyd @pinnacleconsultinggroupinc.com <br /> SECTION 2—PROJECT DESCRIPTION <br /> A. Description of PROJECT: This LOAN CONTRACT is to be used for the Chatfield <br /> Reallocation Project, specific to the "first cost of storage" as defined in the <br /> Agreement Between the Department of the Army and the Colorado Department of <br /> Natural Resources for Reallocation of Water Storage Space, Recreation <br /> Modifications, and Compensatory Mitigation Features at the Chatfield Dam and <br /> Reservoir, Colorado dated October 9, 2014 and is defined as the "PROJECT". It will <br /> provide 20,600 acre-feet (AF) of storage in Chatfield between elevations 5432 and <br /> 5444 MSL for M&I water supply and other purposes including agriculture, <br /> environmental restoration and recreation and fishery habitat protection and <br /> enhancement. The District will directly receive 941.5 AF and, through the South <br /> Metro Water Supply Authority, indirectly receive 64.3 AF, for a total storage <br /> space of 1005.8 AF. The BORROWER'S estimated pro-rata cost share, based on <br /> their storage allotment, is $795,000 and the loan amount approved by CWCB is <br /> $723,160 which includes a loan origination fee of 1% of $7,160. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br /> dated March 2014 on the PROJECT, titled "Castle Pines North Metropolitan District, <br /> Participation in the Chatfield Reservoir Reallocation Project,"which was prepared <br /> by Jim Nikkei, P.E. District Manager with support from Peggy Dowswell, CPA, <br /> District Finance Director and Joan Fritsche, Esq., of Collins Cockrel & Cole. The <br /> {00466510.DOCX I} <br /> Appendix 1 <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.