Laserfiche WebLink
D. The BORROWER shall notify or cause the entity that oversees construction of the <br /> Project to notify CWCB of the bid opening date, time and location. CWCB staff <br /> may elect to attend the bid opening. <br /> E. CWCB must approve the award of the construction contract. <br /> F. The BORROWER shall contract or cause the entity that oversees construction of the <br /> Project to contract for the construction of the work with responsible and capable <br /> construction firms, which are found acceptable by the CWCB staff. <br /> G. The BORROWER must provide or cause the entity that oversees construction of the <br /> Project to provide a copy of the executed construction contract documents <br /> H. consisting of the contractor's proposal, construction contract, performance bond, <br /> payment bond, notice of award, notice to proceed, sample change order, and <br /> sample field order, as well as the advertisement for bid and bid bond at bidding. <br /> After the CWCB staff verifies that these documents comply with the terms of this <br /> CONTRACT, the BORROWER may issue or cause the entity that oversees <br /> construction of the Project to issue the notice to proceed to the construction firms. <br /> I. The BORROWER shall conduct or cause the entity that oversees construction of the <br /> Project to conduct a pre-construction conference at which time the CWCB staff <br /> shall have the opportunity to review and approve the construction schedule. <br /> J. If the CWCB staff determines that the PROJECT requires a resident inspector during <br /> construction, the BORROWER shall employ or cause the entity that oversees <br /> construction of the Project to employ an inspector who has been approved by the <br /> CWCB staff. <br /> K. The BORROWER shall construct or cause the entity that oversees construction of <br /> the Project to construct the PROJECT in accordance with the approved plans and <br /> specifications. <br /> L. Upon completion of the PROJECT construction, the BORROWER shall provide or <br /> cause the entity that oversees construction of the Project to provide as-built <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., <br /> the BORROWER shall provide or cause the entity that oversees construction of the <br /> Project to provide the as-built drawings to the State Engineer's Office for approval <br /> and filing. <br /> M. Upon completion of the PROJECT construction, the BORROWER shall arrange or <br /> cause the entity that oversees construction of the Project to arrange a final <br /> inspection for the CWCB staff. <br /> N. The BORROWER shall pay or cause the entity that oversees construction of the <br /> Project to pay all of the expenses related to the PROJECT when such bills are due. <br /> Appendix 1 <br /> Page 3 of 4 <br />