Laserfiche WebLink
C N COLORADO Continental Dam Spillway Restoration Project <br /> Colorado Water <br /> Conservation Board Santa Maria Reservoir Company <br /> a : Substantially Complete November 1, 2015 <br /> ) <br /> a <br /> 9. <br /> ip- <br /> y . <br /> . <br /> . . , rr. <br /> - <br /> �„" ',�`" _`-- :+� ,"ms's,z-�- "`'; <br /> is`""lik I/ v <br /> "4 A -.1." — - ' ,%y,--,, , '1 ,',,ere..1..."I,3.00.4,4„.0-: <br /> �• T <br /> .4te-, , a _ -.- V I :r�•kc �a• (00.r. <br /> ,„,4.,, •+�.. yr i. v# i, I d r <br /> s , ,' -,„,r,„,_ r y`3 `fir *w.__. x- <br /> s f - � <br /> _. ..:� rw^ on. _-tea• r ei �i i •„II <br /> Project Description <br /> The Santa Maria Reservoir Company owns and operates Continental Reservoir (27,000 AF) and Santa Maria <br /> Reservoir (43,500 AF), located in the Rio Grande River Basin near Creede, Colorado. Santa Maria and <br /> Continental operate in conjunction with each other via a century old conveyance system made up of a <br /> pipeline, siphon, and open ditch. For the past 20 years, Continental has been under a storage restriction <br /> due to seepage issues, limiting the storage to 15,000 AF. The Company completed a two phased approach <br /> to rehabilitate its system. The second phase (this project) was the rehabilitation of the spillway at <br /> Continental Reservoir and seepage control system added to the dam embankment. Funding for this <br /> project also included $1,013,750 in grant funds from the CWCB's WSRA program. <br /> P R O J E C T D A T A <br /> Sponsor: The Santa Maria County: Hinsdale ft Mineral Water Source: North Clear <br /> Reservoir Company Creek <br /> Type of Loan: Dam Rehabilitation _ Board Approval Date: September 25, 2013 <br /> Terms of Loan: $3,677,663 @ 1.75% for 30 years <br /> Design Engineer: AECOM <br /> Contractor: Moltz Constructors, Inc. <br /> Project Elements: 1,200 CY of concrete placed for spillway replacement, 6,000 CY of filter material <br /> placed in dam embankment <br /> Water Project Loan Program - Project Summary <br />