My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2004 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2004 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 10:29:28 AM
Creation date
9/30/2015 1:45:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2004
Contractor Name
Parkville Water District
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Parkville Water District Agenda Item 23c <br /> September 15-17, 2015 Board Meeting(Updated September 18, 2015) <br /> Page 6 of 8 <br /> Funding Summary/Matching Funds: <br /> Cash In-kind Total <br /> Parkville Water District $53,430 $0 $53,430 <br /> CWCB Loan $180,000 n/a $180,000 <br /> Sub-total matching funds $233,430 $0 $233,430 <br /> Arkansas Basin Account $50,000 n/a $50,000 <br /> WSRA Statewide Account $250,000 n/a $250,000 <br /> Total $533,430 $0 $533,430 <br /> All products, data and information developed as a result of this grant must be provided to the CWCB in <br /> hard copy and electronic format as part of the project documentation. This information will in turn be <br /> made widely available to Basin Roundtables and the general public and will help promote the <br /> development of a common technical platform. In accordance with the revised WSRA Criteria and <br /> Guidelines, staff would like to highlight additional reporting and final deliverable requirements. The <br /> specific requirements are provided below. <br /> Reporting: The applicant shall provide the CWCB a progress report every 6 months, beginning from the <br /> date of the executed contract. The progress report shall describe the completion or partial completion <br /> of the tasks identified in the scope of work including a description of any major issues that have <br /> occurred and any corrective action taken to address these issues. <br /> Final Deliverable: At completion of the project, the applicant shall provide the CWCB a final report <br /> that summarizes the project and documents how the project was completed. This report may contain <br /> photographs, summaries of meetings and engineering reports/designs. <br /> Engineering: All engineering work (as defined in the Engineers Practice Act (S12-25-102(10) C.R.S.)) <br /> performed under this grant shall be performed by or under the responsible charge of professional <br /> engineer licensed by the State of Colorado to practice Engineering. <br />
The URL can be used to link to this page
Your browser does not support the video tag.