My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-1987 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-1987 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2016 1:35:05 PM
Creation date
9/30/2015 1:44:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-1987
Contractor Name
Fort Lyon Canal Company
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fort Lyon Canal Company Agenda Item 23a <br /> September 15-17,2015 Board Meeting(Updated September 18, 2015) <br /> Page 4 of 7 <br /> This alternative could be completed during the planned November 15th to March 15th canal <br /> shutdown, but it has the longest construction schedule and the greatest chance of delays due to <br /> weather and other factors. The cost for this alternative is estimated at $2,015,000 <br /> The Company and its engineers decided alternative 3 would provide the best combination of cost, <br /> constructability, and long-term reliability. Costs for this alternative are shown in the following table. <br /> TABLE 2: ESTIMATED PROJECT COST <br /> Task Cost <br /> Design and Permitting $403,000 <br /> Construction $1,785,000 <br /> TOTAL COST $2,188,000 <br /> TABLE 3: PROJECT FUNDING SUMMARY <br /> Percent of total Funding <br /> project costs <br /> CWCB Construction Fund Loan 74% $1,613,000 <br /> CWCB Water Supply Reserve Grant - Basin Account 2% $50,000 <br /> CWCB Water Supply Reserve Grant - Statewide Account 21% $450,000 <br /> Company Cash Match 3% $75,000 <br /> TOTAL 100% $2,188,000 <br /> CWCB Grant funds will be disbursed at a cumulative maximum 23% of the total of all invoices submitted <br /> for reimbursement. <br /> The Company has already ordered the large diameter steel pipe, which has a long manufacturing and <br /> delivery time, in order to meet their construction schedule. Invoicing related to the steel pipe will be <br /> eligible for reimbursement from loan funds, but not until the project's selected construction <br /> contractor is under contract and formally accepts and takes control and liability for the steel pipe and <br /> any additional related items ordered prior to construction notice-to-proceed. <br /> Permitting: The work will be completed outside of the banks of Horse Creek with no dredge or fill <br /> material within Horse Creek itself, so no 404 permitting is anticipated. The contractor will be required <br /> to secure Fugitive Particulate Air Pollution Emission Notice/Control Plan, and a required Stormwater <br /> Discharges Associated with Construction Activity Permit from the Colorado Department of Health and <br /> Environment. <br /> Schedule: The Company plans to complete the construction during the November 15, 2015 to March 15, <br /> 2016 canal shutdown period. It is expected to take three to four months to fabricate and deliver the <br /> steel pipe. At the Company's April 23, 2015 Board of Directors meeting the engineers were authorized <br /> to begin final design work on pipe procurement and construction documents for the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.