My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-917 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2017-917 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 9:13:00 AM
Creation date
9/30/2015 1:32:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-917
Contractor Name
Lamar, City of
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DNR COLORADO <br /> CO Colorado Water <br /> Conservation Board <br /> Department of Natural Resources <br /> 1313 Sherman Street, Room 718 <br /> Denver, CO 80203 <br /> September 30, 2015 <br /> Mr. John Sutherland, City Administrator <br /> City of Lamar <br /> 102 E. Parmenter Street <br /> Lamar, CO 81052 <br /> Re: Repurposing of Wells 12 Ft 13 Project <br /> Mr. Sutherland: <br /> I am pleased to inform you that on September 17, 2015, the Colorado Water Conservation Board approved <br /> your loan and grant request for the Project as described in the Applications and approved Loan <br /> Feasibility Study titled "Feasibility Study - Repurposing of Lamar Wells #12 and #13"dated August <br /> 2015. The Board approved a loan not to exceed $101,000 ($100,000 for project costs and $1,000 for the <br /> 1% Loan Service Fee). The loan terms shall be 1.95% per annum for 10 years. The Board also approved <br /> a WSRA grant for up to $161,625 for eligible Project costs. <br /> After the Board approves a loan/grant there are a few steps that remain in the process including: <br /> Contracting: An executed loan and grant contract must be in place before work can begin on eligible <br /> project expenses. Peg Mason will contact you to initiate the contracting process; however, Peg can be <br /> reached at (303) 866-3441 x3227. <br /> Design/Construction: You must adhere to the CWCB Design and Construction Administration Procedures <br /> including an invitation to the Prebid, Preconstruction and Bid Opening meetings. Derek Johnson, P.E., will <br /> be the Project Manager and will work with you on the disbursements of your loan funds. He can be reached <br /> at (303) 866-3441 x3254. <br /> On behalf of the Board, I would like to thank you for your interest in a loan and grant from the <br /> Colorado Water Conservation Board. <br /> Sincerely, <br /> \492_12 _ <br /> Kirk Russell, P.E., Chief <br /> Finance Section <br /> Attachment: Updated Board Memo <br /> E-mail Copy (Including Attachments): Alan Hamel, CWCB Board Member- Arkansas River Basin <br /> 7-6f_65:-46 , <br /> %wrat <br /> P 303.866.3441 F 303.866.4474 www.cwcb.state.co.us iii/ ° qo\ <br /> John W. Hickenlooper, Governor I Mike King, DNR Director I James Eklund, CWCB Director \* , / <br /> � �u.- * <br />
The URL can be used to link to this page
Your browser does not support the video tag.