My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-1597 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-1597 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2015 9:51:48 AM
Creation date
9/23/2015 9:51:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-1597
Contractor Name
Oligarchy Irrigation Company
Contract Type
Loan
County
Boulder
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 5—SCHEDULE OF EXISTING DEBT <br /> The BORROWER has an existing loan, with the Colorado Water Conservation Board <br /> Contract #CT2015-025 (C150372), given to the BORROWER in 2013 as an emergency <br /> loan in the amount of $1,262,500, with an interest rate of 2.50% per annum and a term <br /> of 30 years. The loan has an estimated maturity date of 2043 and is in good standing. <br /> SECTION 6 -COLLATERAL <br /> The COLLATERAL provided for this loan, as evidenced by the executed SECURITY <br /> AGREEMENT (Appendix 4) and DEED OF TRUST (APPENDIX 5) and incorporated herein, <br /> shall be a pledge of assessment revenues backed by an assessment covenant and <br /> an undivided one hundred percent (100%) interest in the OLIGARCHY RESERVOIR <br /> NUMBER 1 OUTLET WORKS as more particularly described in the attached DEED OF <br /> TRUST ("COLLATERAL"). <br /> SECTION 7—ADDITIONAL CONDITIONS &CONTRACT REQUIREMENTS <br /> None. <br /> SECTION 8—CONSTRUCTION LOAN PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the State of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. Engineering contracts and the plans and specifications must be submitted to the <br /> CWCB staff for verification of compliance with the terms of this CONTRACT when <br /> available prior to bidding. Any modifications, to the plans and specifications that <br /> effect changes to the construction costs must be approved in writing by CWCB <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br /> § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br /> Engineer's Office prior to construction. <br /> D. The BORROWER shall notify CWCB of the bid opening date, time and location. <br /> CWCB staff may elect to attend the bid opening. <br /> E. CWCB must approve the award of the construction contract. <br /> F. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, selected by the BORROWER and found acceptable by <br /> the CWCB staff. <br /> G. The BORROWER must provide a copy of the following construction contract <br /> documents: executed contractor's proposal, executed construction contract, <br /> executed performance bond, executed payment bond, executed notice of award, <br /> proposed notice to proceed, sample change order, and sample field order, as well <br /> as the advertisement for bid and bid bond at bidding. After the CWCB staff verifies <br /> that these documents comply with the terms of this CONTRACT, the BORROWER may <br /> issue the notice to proceed to the Construction Firms. <br /> H. The BORROWER shall conduct a pre-construction conference at which time the <br /> Appendix 1 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.