My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-1597 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-1597 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2015 9:51:48 AM
Creation date
9/23/2015 9:51:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-1597
Contractor Name
Oligarchy Irrigation Company
Contract Type
Loan
County
Boulder
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: OLIGARCHY IRRIGATION AGENCY NAME: COLORADO WATER <br /> COMPANY CONSERVATION BOARD <br /> REQUESTED LOAN AMOUNT: $774,000 CONTRACT TYPE: PRIVATE <br /> LOAN SERVICE FEE $7,740 CWCB CMS #82003/CORE: CT2016-1597 <br /> LOAN AMOUNT $781,740 <br /> LOAN CONTRACT <br /> (STANDARD CONTRACT-WAIVER#160-APPROVED NOVEMBER 10,2003) <br /> THIS CONTRACT, made between the State of Colorado for the use and benefit of The <br /> Department of Natural Resources, Colorado Water Conservation Board ("CWCB" or <br /> "STATE"), and Oligarchy Irrigation Company, 157 Baylor Way, Longmont, Colorado, 80503, <br /> ("BORROWER"), a Colorado nonprofit corporation. <br /> FACTUAL RECITALS <br /> 1. CWCB authority exists in the law, and funds have been budgeted, appropriated and <br /> otherwise made available and a sufficient unencumbered balance thereof remains <br /> available for encumbering and subsequent payment of this CONTRACT; and <br /> 2. Required approval, clearance, and coordination have been accomplished from and with <br /> appropriate agencies; and <br /> 3. On July 15, 2015 the CWCB approved a loan request from the BORROWER for the Dam <br /> Outlet Works Rehabilitation to rehabilitate the Oligarchy Reservoir No. 1 dam outlet <br /> works by constructing a new outlet works gate vault, outlet works piping, intake <br /> structure, and discharge structure. The total estimated project cost is $860,000. The <br /> total loan amount of $781,740 which includes a one percent (1%) loan origination fee <br /> of$7,740 is payable over 30 years at an interest rate of 2.40%; and <br /> 4. The PROJECT SUMMARY, attached as APPENDIX 1, and incorporated herein contains <br /> BORROWER Information (Section 1), the PROJECT Description (Section 2), CWCB's <br /> authority for making this loan (Section 3), and CWCB Approval (Section 4), identifying <br /> the amount of the loan and the terms of repayment. The PROJECT SUMMARY also <br /> contains sections on BORROWER'S debt, collateral, procedures and eligible expenses. <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this <br /> PROJECT upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained <br /> herein, the parties agree as follows: <br /> A. LOAN PROVISIONS <br /> 1. Loan Service Fee. The amount of the loan (LOAN AMOUNT) shall include (1) the <br /> amount of the funds loaned by the CWCB to the BORROWER for the PROJECT and (2) <br /> a service fee of one percent (1%) of the PROJECT amount. In the event that the <br /> BORROWER does not use the LOAN AMOUNT authorized, the parties shall amend this <br /> CONTRACT to revise the LOAN AMOUNT including adjustment of the service fee to reflect <br /> 1% of the actual LOAN AMOUNT disbursed to the BORROWER. <br /> Page 1 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.