My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-027 Increase 2 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-027 Increase 2 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 4:01:19 PM
Creation date
7/21/2015 9:08:18 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-027
C150341
Contractor Name
Pisgah Reservoir and Ditch Company
Contract Type
Loan
County
Teller
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DNR COLORADO 1313 Sherman Street John Hickenlooper, Governor <br /> Denver, CO 80203 <br /> CO Colorado Water Mike King, DNR Executive Director <br /> Conservation Board P (303)866-3441 <br /> Department of Natural Resources F(303)866-4474 James Eklund, CWCB Director <br /> TO: Colorado Water Conservation Board Members <br /> FROM: Jonathan Hernandez, P.E., Project Manager <br /> Kirk Russell, P.E., Finance Section Chief N,,(.2 <br /> DATE: July 15-16, 2015 Board Meeting (Updated July 17, 2015) <br /> AGENDA ITEM: 12a - Change to Existing Loans <br /> Pisgah Reservoir and Ditch Company- Mount Pisgah Dam/Wrights Reservoir <br /> Outlet Works Rehabilitation Project <br /> Introduction <br /> The Pisgah Reservoir and Ditch Company (Company) received approval of a $161,345 CWCB loan <br /> (C150341) and a matching $161,345 WSRA grant (C150505) to finance the Mount Pisgah Dam/Wrights <br /> Reservoir Outlet Works Rehabilitation Project (Project) at the September 2012 CWCB Board Meeting. <br /> The purpose of the Project is to make improvements to the Pisgah Dam outlet works, per the State <br /> Engineer's Office direction. The loan and grant together funded approximately 90%of the Project's <br /> 2012 estimated cost of $362,690. The Company returned to CWCB to seek additional funds based on <br /> final engineering and were approved for a total loan of $543,655 at the November 2014 CWCB Board <br /> Meeting; the WSRA grant remained unchanged. As a result of the bids received in May 2015, the <br /> Company is requesting an additional increase to its loan, but is not seeking an increase to its WSRA <br /> grant. See attached Project Data Sheet for a location map and Project summary. <br /> Staff Recommendation (Board Approved Staff Recommendation on July 15, 2015) <br /> Staff recommends the Board approve a loan increase of $623,170 ($617,000 for Project costs and <br /> $6,170 for the 1% Loan Service Fee) for a total loan not to exceed $1,172,261 ($1,160,655 for Project <br /> cost and $11,606 for the 1% Loan Service Fee) to the Pisgah Reservoir and Ditch Company for <br /> engineering and construction costs related to the Mount Pisgah Dam/Wrights Reservoir Outlet Works <br /> Rehabilitation Project from the Construction Fund. The loan terms shall remain at 30 years at a <br /> blended interest rate of 1.75% per annum. Security for the loan shall be a pledge of assessment <br /> revenues backed by an assessment covenant and the Wrights Reservoir (aka Mount Pisgah Reservoir) <br /> and Mount Pisgah Dam including all associated appurtenances, rights-of-ways, easements, and the <br /> underlying parcel, which is in compliance with CWCB Financial Policy#5. <br /> (Interstate Compact Compliance •Watershed Protection • Flood Planning a Mitigation • Stream t Lake Protection <br /> Water Project Loans Et Grants•Water Modelin g • Conservation i Drou g ht Plannin g •Water Supply Plannin g * <br /> of <br /> !!y��� <br /> /876 1° <br /> * <br />
The URL can be used to link to this page
Your browser does not support the video tag.