My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153701 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C153701 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2015 10:46:51 AM
Creation date
7/7/2015 10:43:34 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153701
Contractor Name
Fort Morgan, City of
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 0 <br /> attributable to the operation of the Pipeline. <br /> vi. Allottee agrees to make payment of, pursuant to the procedures set out in paragraph <br /> 8.a. below and subject to paragraph 8.b. below, its share of such an annual amount as <br /> the Board shall determine to be necessary to establish and maintain an operating and <br /> maintenance reserve fund equal to eighteen months operating and maintenance charges <br /> and costs. <br /> c. The payments described in this paragraph 6 and in paragraph 8 below are full payment for all <br /> water delivery services to be provided to Allottee under this Contract. No other charge, fee, <br /> tax, or levy for the Pipeline or the use thereof, shall be made to Allottee or its citizens, <br /> directly or indirectly by SWSP Enterprise; except for any fees, charges or assessments charged <br /> or • :•d by the District or Subdistrict in connection with allotment contracts for District <br /> t` . , ubdistrict water or inclusion of the Allottee or its land area within the boundaries <br /> V) i'4. i' t ►�...trict or Subdistrict, or taxes charged or levied by the District or Subdistrict on <br /> ��,, .p�, included 'ithin the District or Subdistrict. <br /> d. :t mo e a $ o'a„he SWSP Enterprise by the Allottee under this Contract shall be kept in <br /> e';,a <br /> $ - ,i' from all other accounts of the SWSP Enterprise or the District and shall be <br /> 11144 <br /> e + ly for Pipeline purposes as specified in this Contract. <br /> 7. Estimated Demand and Delivery Schedule. Commencing in the year in which the Pipeline becomes <br /> operational and on or before December 1 of each year thereafter, Allottee shall provide the SWSP Enterprise with <br /> an estimated demand and delivery schedule for the use of its capacity, not to exceed the amount allotted herein, <br /> for the following calendar year. This schedule shall contain the time and quantities of water which Allottee <br /> estimates it shall require to be transmitted by the Pipeline. This schedule may be modified by the Allottee <br /> from time to time as the need warrants, in its sole discretion, within the physical capabilities of the <br /> Pipeline. Such demand and delivery schedules shall be consistent with the demand and delivery schedules <br /> submitted by Allottee for use of capacity in the Carter Lake to Broomfield Pipeline. <br /> 8. Payment of Charges. <br /> a. Payment of the costs for annual administration, operation and maintenance, including repair, <br /> shall be the responsibility of the Participants which shall be allocated on the same <br /> percentages which determine each Participant's Construction Costs, including the Allottee's <br /> Construction Costs as set forth on Schedule B. No later than three (3) months prior to the <br /> completion of construction of the Pipeline, the SWSP Enterprise shall issue a billing statement <br /> to Allottee requiring payment of the anticipated annual charges and costs to be incurred for <br /> administration, operation, maintenance, repair and replacement of the Pipeline for the <br /> remainder of that Fiscal Year, pursuant to paragraphs 6.b.j. and 6.b.vi. above and to establish <br /> reserve funds. In succeeding years, a statement of estimated annual charges shall be issued <br /> on or before October 15 of each year for the current Fiscal Year. A billing statement for <br /> annual charges shall be issued on or before January 15 of each year for the current Fiscal <br /> Year. Charges and costs for administration, operation, maintenance, repair and replacement <br /> of the Pipeline shall be allocated either as General Pipeline Costs, Individual Segment <br /> Specific Costs or Non-Segment Specific Costs as described in paragraphs 5.a., 5.b. and 5.c. <br /> above. Except for the first year, estimated charges and costs for administration, operation, <br /> maintenance, repair and replacement shall be based on the anticipated use of the Pipeline for <br /> the current Fiscal Year using the costs of administration, operation, maintenance, repair and <br /> replacement for the prior Fiscal Year, plus any positive and negative adjustments necessary <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.