My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153701 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C153701 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2015 10:46:51 AM
Creation date
7/7/2015 10:43:34 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153701
Contractor Name
Fort Morgan, City of
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ID <br /> operation of any other facilities which are hydraulically connected to the Pipeline <br /> interfere with the intended operation of the Pipeline, Allottee shall cease operation <br /> of those facilities upon receiving written notification of interference by the SWSP <br /> Enterprise until modifications can be made to eliminate any interference. Except as <br /> provided in paragraph 2.c. above, Allottee shall not construct or install any <br /> modifications to facilities which are hydraulically connected to the Pipeline without <br /> first obtaining prior technical approval for such modifications in writing from the <br /> SWSP Enterprise to ensure that such facilities do not interfere with the hydraulic <br /> characteristics or operations of the Pipeline, or otherwise potentially damage the <br /> Pipeline. <br /> 5. Cost Allocation Methodology. All costs for planning, design, right-of-way acquisition, <br /> construction, administration, operation, maintenance, repair and rehabilitation of the Pipeline will be divided <br /> into three categories: General Pipeline Costs, Individual Segment Specific Costs and Non-Segment Specific <br /> Costs. <br /> a. General Pipeline Costs will be those costs which cannot be specifically related to an <br /> individual Segment and which shall be allocated based upon the Participants' percentages in <br /> Segment Fl, as set forth on Schedule B. <br /> b. Individual Segment Specific Costs will be those costs which relate only to an individual <br /> s•- egment of the Pipeline including, but not limited to, costs for right-of-way, the <br /> •":t • resigning, purchasing and installing the Pipeline SCADA system and construction. <br /> '000,T. „; -?' be a Segment Specific Cost category for each Segment of the Pipeline. Individual <br /> egment Spec. '. Costs will be allocated based upon each Participant's share of the capacity <br /> o •• vi. ,n gment allocated to all Participants as set forth on Schedule B. <br /> 14S ;: '-n'`:,• �pecific Costs will be those costs which cannot be specifically related to an <br /> a ' "`dividual Segment, but which can be allocated based on Pipeline length. Non-Segment Specific <br /> Costs include, but are not limited to, design, engineering and administration costs and will <br /> be allocated to each Segment of the Pipeline based on the length of that Segment as a <br /> proportion of the total length of the Pipeline. The percentages established for the sharing <br /> of these costs for each Segment are as set forth on Schedule B. <br /> d. Allottee's Construction Costs shall be a collective reference to the amounts determined to be <br /> due hereunder from Allottee after calculating the Allottee's share of General Pipeline Costs, <br /> Individual Segment Specific Costs and Non-Segment Specific Costs, minus preconstruction costs, <br /> as defined herein (excluding any costs for operation and maintenance). <br /> 6. Charges and Costs. <br /> a. Allottee has previously agreed to pay $519,600.00 as its pro rata share of the Pipeline pre- <br /> construction costs incurred for administration, preliminary and final design, environmental <br /> evaluations and other necessary items. Of this amount, Allottee has already paid $519,600.00. <br /> b. In return for the perpetual, exclusive allocation and use of Pipeline capacity as described <br /> in this Contract, subject to the terms and conditions of this Contract and as provided in <br /> C.R.S. §§ 37-45-101 et seq., as amended, Allottee shall pay to the SWSP Enterprise Allottee's <br /> Construction Costs in the total amount of $4,864,400.00, upon the execution of this Contract <br /> by Allottee. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.