Laserfiche WebLink
• • <br /> AGENCY NAME: Water Conservation Board <br /> AGENCY NUMBER: PDA <br /> V1041) <br /> ROUTING NUMBER: CS — P)A - �,,-�C:G}X <br /> • AN CONTRACT <br /> THIS CONTRACT, made this 3 — day of September 2000, by and between the State of <br /> Colorado for the use and benefit of the Department of Natural Resources, Colorado Water <br /> Conservation Board, hereinafter referred to as the CWCB and/or STATE, and Riverside Reservoir and <br /> Land Company, a Colorado nonprofit corporation, 215 E. Kiowa, Fort Morgan, CO, 80701, hereinafter <br /> referred to as the BORROWER and/or CONTRACTOR. <br /> FACTUAL RECITALS <br /> 1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br /> available and a sufficient unencumbered balance thereof remains available for payment in Fund <br /> Number 424, Organization YYYY, Appropriation S00, GBL RRLQ Program WTRC, Object Code <br /> 5881, Reporting Category: 0044, Contract Encumbrance Number C150044. <br /> 2. Required approval, clearance, and coordination have been accomplished from and with <br /> appropriate agencies. <br /> 3. Pursuant to the provisions of §§ 37-60-119 and 37-60-120, C.R.S. (1999) the STATE is authorized <br /> to loan money for the construction of water projects for the benefit of the people of the State, <br /> provided that the borrower assures repayment of that money. <br /> 4. The BORROWER is a duly constituted Colorado ditch company formed pursuant to and governed <br /> by Articles 42 and 121 of Title 7, C.R.S., located in Morgan County, State of Colorado. <br /> 5. The BORROWER has applied to the STATE for a loan to be used for rehabilitation of the <br /> BORROWER'S diversion structure on the South Platte River, hereinafter referred to as PROJECT, at <br /> a cost of $450,000. <br /> 6. The STATE has reviewed a feasibility report compiled by Jack Odor, P.E., which is incorporated <br /> herein by reference, and was financed in part by a $5,000 grant from CWCB, and, based upon <br /> this feasibility report, the STATE determined the PROJECT to be technically and financially feasible. <br /> 7. At its March 2000 meeting, the CWCB approved a loan to the BORROWER in an amount up to <br /> $405,000, not to exceed 90% of the cost of the PROJECT, at an interest rate of 4% per annum for <br /> a duration of 30 years, from the Severance Tax Perpetual Base Account. <br /> 8. Pursuant to H.B. 00-1419, Section 1(1), the Colorado General Assembly authorized CWCB to <br /> loan to the BORROWER an amount up to $405,000, hereinafter referred to as AUTHORIZED LOAN <br /> AMOUNT, for the PROJECT. <br /> 9. The STATE now desires, by this contract, to loan money to the BORROWER for this PROJECT upon <br /> mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained herein, <br /> the parties agree as follows: <br /> Riverside Reservoir and Land Company Page 1 of 12 Loan Contract C150044 <br />