My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-097 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-097 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 3:54:22 PM
Creation date
5/8/2015 3:54:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-097
Contractor Name
Sterling Irrigation Company
Contract Type
Loan
Water District
64
County
Logan
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4, COLORADO Emergency Sterling Ditch Rehabilitation Project <br /> co Colorado ater <br /> Conservation W Board Sterling Irrigation Company <br /> Substantially Complete May 2015 <br /> k, <br /> k <br /> Willro <br /> k <br /> 4 x e y-'i'na _ <br /> ore <br /> wt <br /> y c <br /> i <br /> d ,. s A `.,..4 <br /> J w <br /> . <br /> Y <br /> i . h <br /> Project Description <br /> During the unprecedented flood of September 2013 in the tributaries to the South Platte River, a <br /> significant number of diversion structures and dams along the river corridor were damaged, including the <br /> Company's ditch. Floodwaters overtopped the headgate structure and entered the ditch resulting in <br /> significant sedimentation and the weakening of ditch banks. During the 2014 snowmelt high-water runoff, <br /> uncontrolled waters again entered the ditch causing additional sedimentation and ditch bank breaches. <br /> Construction crews repaired the breaches and removed sand from the ditch channel and upstream river <br /> channel. The first phase was the immediate clean out following the September 2013 flood event and the <br /> second phase was the clean out and breach repair following the spring 2014 snowmelt runoff. <br /> P R O J E C T D A T A <br /> Sponsor: Sterling Irrigation County: Logan Water Source: South Platte <br /> Company River <br /> Type of Loan: Ditch Rehabilitation Board Approval Date: September 2014 <br /> Terms of Loan: $101,000 @ 1.50% for 10 years <br /> Design Engineer: NA <br /> Contractor: Ransom Boone Excavating <br /> Project Elements: Remove sedimentation and repair ditch breaches caused by flooding. <br /> Water Project Loan Program - Project Summary <br />
The URL can be used to link to this page
Your browser does not support the video tag.