Laserfiche WebLink
• • <br /> ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br /> CRS 24-30-202 requires that the State Controller approve all state contracts. This <br /> contract is not valid until the State Controller, or such assistant as he may <br /> delegate, has signed it. The contractor is not authorized to begin performance <br /> until the contract is signed and dated below. If performance begins prior to the <br /> date below, the State of Colorado may not be obligated to pay for the goods and/or <br /> services provided. <br /> Leslie M. Shenefelt, State Controller <br /> By ��/ �L _ 4, ti <br /> Effective Date -5/.510 <br /> Rfir x; <br /> Loan Contract C150220 <br /> Page 11 of 11 <br />