My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153167 Paid in Full Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C153167 Paid in Full Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:42 PM
Creation date
4/8/2015 9:39:40 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153167
Contractor Name
Dove Creek, Town of
Contract Type
Loan
Water District
32
County
Dolores
Bill Number
SB 11-35
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• S <br /> a. Construction of raw water reservoir, complete with <br /> appurtenances, which reservoir shall be approximately 100 acre <br /> feet in volume . <br /> b. 3,140 feet of 8-foot high chainlink fence around <br /> aforestated reservoir. <br /> c . Construction of 500, 000 gallon steel reservoir for <br /> treated water storage with appurtenances . <br /> d . 9, 800 feet of 6-inch PVC main lines . <br /> e . One state highway crossing. <br /> f. 22 service meter assemblies. <br /> g. Five 6-inch line valves. ATIFIrati <br /> It is understood that aforestated system will start a <br /> the treatment plant reservoir site, being the northwest 1/4, <br /> southwest 1/4 , Section 31, Township 41 North, Range 18 West, <br /> N.M.P.M. , and the main line will terminate at a point south <br /> of Dove Creek along Highway No. 666 in Section 6 , Township <br /> 40 North, Range 18 West, N.M.P.M. <br /> It is understood that all the aforestates services shall <br /> be provided in conformance with good engineering practice, <br /> the specifications and drawings previously supplied and approved <br /> by the Colorado Water Conservation Board, and in conformance <br /> with the rules and regulations of the Colorado Water Conservation <br /> Board, all as more particularly described in the original Contract <br /> between the parties. <br /> It is clearly understood between the parties that this <br /> Addendum shall not be construed to waive, modify, void, or <br /> supersede any other contractual covenant or condition set forth <br /> in hereinbefore described Contract, other than alteration of <br /> provision as set forth at Paragraph 2, Page 2 . <br /> Signed this day of , 197 <br /> TOWN OF DOVE CREEK STATE OF COLORADO <br /> RICFARD D . LAMM, GOVERNOR <br /> � � <br /> CONTRACTOO p �= BY 5E_ r / , or <br /> Loy Knuckles EXECUTIVE r RECTO(, HARRIS D. SHERMAN <br /> POSITION: Mayor DEPARTMENT OF NATURAL RESOURCES <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.