My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150240 Vegitation Montioring Analysis
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150240 Vegitation Montioring Analysis
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:10:33 PM
Creation date
3/2/2015 9:05:35 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150240
Contractor Name
Bull Creek Reservoir, Canal & Power Company
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
New wetland areas currently end approximately 15 feet from the new high water mark. Given <br /> more time, it is expected that wetland will extend to the new high water mark. In 2012 and 2013, <br /> water levels were not sufficient to sustain wetland. 2012 was a dry year and drawdown began the <br /> first part of June. In 2013, the reservoir was not filled to perform maintenance on the dam. <br /> Sufficient hydrology was present in 2011 and 2014 to support wetland vegetation. , <br /> Secondary impacts to vegetation cover, richness, and diversity in the newly inundated zone were <br /> not detected. There was a slight decrease of functional value in the hydrogeomorphology index <br /> because of the change to hydrologic regime in the newly inundated zone. Compensation for this <br /> slight decrease in functional value was offset with an increase in wetland surface area. Overall, <br /> the total wetland value for wetlands and fen within the newly inundated zone has increased from <br /> baseline conditions. <br /> It is likely wetland function will continue to improve provided normal drawdown operations <br /> continue. Individual functional indices are expected to increase and additional wetland surface <br /> area is anticipated to develop over time at Bull Creek Reservoir#4. <br /> REFERENCES ' <br /> NRCS. 2014.Natural Resources Conservation Service, United States Department of Agriculture. <br /> National Water and Climate Center SNOTEL site: Mesa Lakes at: <br /> http://www.wcc.nrcs.usda.gov/nwcc/site?sitenum=622&state=co. <br /> SAS Institute. 2009. JMP 9 Modeling and Multivariate Methods. SAS Institute, Cary,North ' <br /> Carolina. <br /> WestWater. 2009. User's Guide for the Grand Mesa Wetland Function and Value Assessment ' <br /> (Grand Mesa Method). October 2009. WestWater Engineering Environmental Consulting <br /> Services. <br /> WestWater. 2010. Bull Creek Vegetation Monitoring Baseline Report. 2010. WestWater <br /> Engineering. <br /> WestWater. 201 la. Bull Creek Reservoir#4 Wetland Monitoring Vegetation Sampling Protocol ' <br /> Revised Field Season 2011. October 2011. WestWater Engineering. <br /> WestWater. 2011b. Bull Creek Reservoir#4 Vegetation Monitoring Report. Sampling Period ' <br /> Comparison 2010 and 2011. October 2011. WestWater Engineering. <br /> WestWater. 2012. Bull Creek Vegetation Monitoring Report. Sampling Period 2010, 2011, <br /> 2012. December 2012. WestWater Engineering. <br /> WestWater Engineering Page 11 of 14 February 2015 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.