My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150240 Wetland Delineation and Preliminary Jurisdictional Determination
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150240 Wetland Delineation and Preliminary Jurisdictional Determination
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:10:33 PM
Creation date
3/2/2015 8:11:34 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150240
Contractor Name
Bull Creek Reservoir, Canal & Power Company
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> I <br /> Label Latitude Longitude Label Latitude Longitude <br /> IL 72 _ 39.0710 -108.0372 DP 4 Up 39.0731 _ -108.0381 <br /> _ L 73 _ 39.0709 -108.0371 DP 4 Wet 39.0731 -108.0381 <br /> L 74 39.0709 -108.0373 DP 5 Wet 39.0757 -108.0359 <br /> IL 76 39.0709 -108.0374 DP 5 Up 39.0757 -108.0359 <br /> L 77 39.0707 -108.0375 DP 6 Wet 39.0729 -108.0354 <br /> IL 78 39.0707 -108.0375 DP 6 Up 39.0729 -108.0354 <br /> L 79 39.0708 -108.0375 DP 7 Wet 39.0710 -108.0370 <br /> DP 1 Up 39.0742 -108.0387 DP 7 Up 39.0710 -108.0369 <br /> IDP 1 Wet 39.0742 -108.0387 DP 8 Wet 39.0709 -108.0365 <br /> DP 2 Up 39.0739 -108.0384 DP 8 Up 39.0709 -108.0365 <br /> I DP 2 Wet 39.0739 -108.0385 DP 9 Wet 39.0712 -108.0355 <br /> DP 3 Wet 39.0735 -108.0382 DP 9 Up 39.0712 -108.0355 <br /> DP 3 Up 39.0735 -108.0382 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 WestWater Engineering Appendix B December 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.