My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150122 PIF Documents
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150122 PIF Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2015 10:30:42 AM
Creation date
2/26/2015 10:30:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150122
Contractor Name
Central Weld County Water District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I 0 <br /> PROJECT SUMMARY— CENTRAL WELD COUNTY WATER DISTRICT— CONTRACT No. C150122 <br /> SECTION 1 —BORROWER INFORMATION <br /> Name: Central Weld County Water District, acting by and through <br /> its Water Activity Enterprise <br /> Address: 2235 2nd Avenue, Greeley, Colorado 80631 <br /> Federal Identification No.: 84-0571286 <br /> Contact: John W. Zadel, General Manager <br /> Phone Number: (970) 352-1284 Fax Number: (970) 353-5865 <br /> E-mail address: wcwdistrict @gwest.net <br /> Type of Entity: Special District formed pursuant to and governed by <br /> Article 1, Title 32, C.R.S. and located in Weld County. <br /> The Central Weld County Water Activity Enterprise is a <br /> water activity enterprise established by the District by <br /> Resolution dated November 18, 1993, pursuant to Article <br /> 45.1, Title 37, C.R.S., which resolution is incorporated <br /> herein by reference. The Enterprise was formed and is <br /> operated as an enterprise within the meaning of COLD. <br /> CONST. Art. X, Section 20. <br /> Section 2 — Project Description <br /> A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be <br /> used for the construction of a new water storage reservoir, located in Larimer <br /> County, hereinafter referred to as the PROJECT, at an estimated total cost of <br /> $10,500,000. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study <br /> report on the PROJECT compiled by Smith Geotechnical Engineering Consultants, <br /> which is incorporated herein by reference, and, based upon the feasibility report, <br /> the CWCB determined the PROJECT to be technically and financially feasible. <br /> SECTION 3 — CWCB's AUTHORITY <br /> Severance Tax Trust Fund Perpetual Base Account:This loan is made pursuant to <br /> the provisions of §§ 39-29-109(1)(a)(I), 37-60-119 anc?37-60-120, C.R.S., which <br /> authorize the CWCB to loan money for water projects from tile ' 0 : Severance Tax <br /> Trust Fund Perpetual Base Account for the llbnefit'of the'peop , - d� •rovided <br /> that the borrower assures repayment of that money. /j <br /> SECTION 4 - BOARD APPROVAL AND LEGISLATIVE AUTHORIZA <br /> At its November 2003 meeting, the CWCB approved a Loa r -r. - Tax <br /> Trust Fund Perpetual Base Account to the BORROWER in an amount up . 010 for <br /> PROJECT Costs, with repayment terms of 4.15% per annum for 20 years. <br /> Pursuant to Bill 03-110, Section 2.b, the Colorado General Assembly authorized <br /> Appendix 1 to Loan Contract C150122 <br /> Page 1 of 4 %. <br />
The URL can be used to link to this page
Your browser does not support the video tag.