My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150276 PIF Documents
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150276 PIF Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2015 10:30:39 AM
Creation date
2/26/2015 10:30:36 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150276
Contractor Name
Center of Colorado Water Conservancy District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• IP <br /> economical manner. <br /> 14. BORROWER'S Liability Insurance. <br /> a. Because the BORROWER is a "public entity" within the meaning of the Colorado <br /> Governmental Immunity Act, CRS 24-10-101, et seq., as amended ("Act"), the <br /> BORROWER shall at all times maintain such liability insurance, by commercial policy <br /> or self-insurance as is necessary to meet its liabilities under the Act. <br /> b. Prior to the disbursement of any loan funds, the BORROWER shall provide the CWCB <br /> with an Acord Form 25 or other form satisfactory to the CWCB evidencing said <br /> insurance and shall provide the CWCB with documentation of renewals of said <br /> insurance. <br /> 15.Additional Contract Requirements. Any additional contract requirements are set <br /> forth in Additional Contract Requirement (Section 6) of the Project Summary. <br /> B. PROJECT PROVISIONS <br /> 1. Construction Fund Program Procedures. During the completion of the PROJECT, the <br /> BORROWER shall adhere to the CWCB Construction Fund Program Procedures <br /> (Section 7) of the Project Summary. <br /> 2. Eligible Expenses. The PROJECT expenses for which the BORROWER is eligible for <br /> loan disbursements are listed in Eligible Expenses (Section 8) of the Project <br /> Summary. <br /> 3, Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br /> Disbursement Schedule (Section 9) of the Project Summary. <br /> 4. Time for Performance. The BORROWER recognizes that time is of the essence in the <br /> performance of all of its obligations under this contract. Therefore, the BORROWER shall <br /> complete the PROJECT within the time specified in Time for Performance (Section 10)of <br /> the Project Summary. <br /> 5. Indemnification By The Construction Finn. The BORROWER shall require all <br /> Construction Firms and their subcontractors to indemnify the STATE and the BORROWER <br /> against all liability and loss, and against all claims and actions based upon or arising <br /> out of damage or injury, including death, to persons or property, caused by any acts or <br /> omissions of those parties or sustained in connection with the performance of any <br /> contract related to the PROJECT or by conditions created the • based upon any <br /> violation of any statute, ordinance, or regulation, and the defe • i' claims or <br /> actions, <br /> 6. Liability Insurance During Construction. During . i• .'/• - PROJECT, the <br /> BORROWER shall require the construction firm(s) and any sue P • 4 • t stain the <br /> following insurance coverage in the limits shown during the term •' =, •:• -cts for <br /> the construction of the PROJECT. The BORROWER shall provide the ■ .j ith an <br /> Acord Form 27 evidencing said insurance prior to commencement of construction, <br /> Loan Contract C150276 <br /> Page 6 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.