Laserfiche WebLink
• <br /> I S <br /> Contract, reviewing construction contract documents, and for complying with all <br /> federal, state, and local regulatory requirements. <br /> J. PRoJEc-r-related expenses incurred prior to the Effective Date of this contract in <br /> accordance with the legislative approval of this loan. <br /> SECTION 9—DISBURSEMENT SCHEDULE <br /> For Project costs: The BORROWER shall prepare a periodic progress report which <br /> contains a statement of the PROJECT costs expended for that period and shall <br /> forward said statement to the CWCB. After receipt of the periodic progress report <br /> from the BORROWER, and review and acceptance of the items therein as eligible <br /> expenses as described below, the CWCB will pay to the BORROWER the amount <br /> set forth in the report or such portion that has been approved by the CWCB. Such <br /> payment shall be made within thirty (30) days from the CWCB's approval of each <br /> progress report. <br /> SECTION 10—TIME FOR PERFORMANCE <br /> PROJECT Beginning: Upon Effective Date of this Contract (the date this contract <br /> is signed by the State Controller or his designee). <br /> PROJECT Finish: Four(4) years from the Effective Date of this Contract. <br /> PAlb <br /> Appendix 1 to Loan Contract C150276 <br /> Page 4 of 4 <br />